Rapeseed / Canola

In short: Rapeseed (and its low-erucic-acid variety canola) is a major oilseed carrying roughly 38–44% oil in a small, thin-coated seed that is pressed whole rather than dehulled. At scale it is typically pre-pressed and then solvent-extracted; small mills press it directly. Canola oil's neutral flavor and favorable fatty-acid profile make it a leading commodity cooking oil.
Indicative composition of Rapeseed / Canola (self-drawn, approximate)41%0%59%OilHull/shellOther (protein, fiber, moisture)
Approximate composition (indicative, self-drawn)

Rapeseed vs canola, and why it is pressed whole

"Rapeseed" is the crop; "canola" is the name for low-erucic-acid, low-glucosinolate varieties bred for food use, now dominant in the food market. The seed is small, round and thin-coated, carrying roughly 38–44% oil. Unlike sunflower, rapeseed is pressed whole — its seed coat is thin, contributes little fiber and separates poorly, so dehulling is impractical and unnecessary. Preparation therefore centers on cleaning, moisture conditioning and often flaking/conditioning rather than decortication. Canola oil's light flavor and low saturated-fat profile have made it one of the world's leading commodity cooking oils.

Rapeseed — processing routeTypical processing route for Rapeseed: Clean → Pre-press → Solvent → RefineRapeseed — processing routeRapeseedCleanPre-pressSolventRefineProcessing routePressed whole; pre-press then extract at scale; fully refined.Schematic — self-drawn by OilProcessingHub, not to scale
Engineering schematic (self-drawn) — rapeseed

Processing route: pre-press then extract at scale

Large rapeseed plants commonly pre-press the conditioned seed in a screw press to remove part of the oil, then solvent-extract the cake to recover the rest — a combination that balances throughput and low residual oil. Small mills simply press, accepting higher cake residual in exchange for simplicity and a solvent-free product. Either way the crude oil needs refining: rapeseed oil carries phospholipids and, for a bland retail product, benefits from full degumming, neutralization/physical refining, bleaching and deodorization. Cold-pressed rapeseed oil is also a growing premium category, sold for its color and nutty character rather than as a neutral commodity.

Cake value and market position

Rapeseed/canola meal is a protein feed, valued somewhat below soybean meal but a significant co-product, particularly for ruminants. The crop's strength is its position as a reliable, temperate-climate commodity oil with a favorable nutritional profile, which sustains large, refining-heavy processing chains. For a small mill, cold-pressed rapeseed oil offers a differentiated premium route, while bulk neutral canola oil is a scale-and-refining game better suited to larger operations.

Typical processing route

Cleaning → Pressing / pre-press → Refining → Filtering → Filling

Estimate output for this seed with the oil yield calculator, and choose a route with the cold-vs-hot chooser.

Key figures (indicative)

ParameterTypical range
Oil content~38–44%
Preparationpressed whole (no dehulling)
Route at scalepre-press + solvent extraction
Refiningusually full (bland commodity oil)
Cake useprotein feed (esp. ruminants)
⚠️ Oil-content, hull and yield figures are indicative ranges from published agronomy — actual values vary by variety, growing conditions and preparation. Verify for your seed. No fabricated numbers.

Rapeseed and canola: the same crop, different grade

"Rapeseed" and "canola" cause endless confusion, so it is worth being precise. Canola is a variety of rapeseed bred to be low in erucic acid and glucosinolates, developed specifically as a food oil. So all canola is rapeseed, but not all rapeseed is canola-grade — traditional high-erucic rapeseed is grown for industrial use, while the low-erucic canola type is the edible oil on supermarket shelves. When a page or label says rapeseed oil for food, it almost always means the canola-grade crop.

Processing route

Rapeseed is a whole-seed crop (not usually dehulled) at about 38–44% oil, and at scale it is typically pre-pressed then solvent-extracted and fully refined into a neutral, high-smoke-point commodity oil. A smaller premium segment is cold-pressed and left unrefined for its flavour and colour. Because canola is naturally high in monounsaturated oleic acid with some omega-3, refined rapeseed/canola oil is a stable, versatile cooking oil. See sunflower vs canola for how it compares with the other major seed oil.

FAQ

Is rapeseed the same as canola?

Canola is a variety of rapeseed bred to be low in erucic acid and glucosinolates for food use. All canola is rapeseed, but traditional high-erucic rapeseed is grown for industrial rather than edible use.

What is the difference between rapeseed and canola?

Canola is a food-grade rapeseed variety bred for low erucic acid and glucosinolates. All canola is rapeseed; not all rapeseed is canola. The processing is essentially the same.

Why is rapeseed not dehulled?

Its seed coat is thin, adds little fiber and separates poorly, so dehulling is impractical. Rapeseed is pressed whole, unlike high-hull seeds such as sunflower.

How much oil does rapeseed contain?

Roughly 38–44% oil, depending on variety and conditions — enough to press economically, and enough to justify pre-press-plus-extraction at large scale.

Does rapeseed oil need refining?

Commodity canola oil is fully refined for a bland, stable product. Cold-pressed rapeseed oil is a growing premium exception, sold unrefined for its flavor and color.

PLAN THIS PROCESSING ROUTE

Rapeseed / canola: from raw material to a supplier brief

Confirm the intended food-grade feed and oil specification before comparing a pressed specialty product with a refined commodity-oil project.

Pressed product

Assess a cold or conditioned pressing route, filtration, storage and packaging for the target product. Confirm preparation and incoming material rather than assuming another oilseed’s line settings apply.

Pre-press plus extraction

Compare an integrated pre-press, cake extraction and refining project. Include meal handling and solvent recovery, and ask for the combined system balance.

Follow the connected stages

  1. Clean the feed — Agree the incoming seed and impurity specification.
  2. Compare pre-pressing — Distinguish a pre-press feeding extraction from a full-press operation.
  3. Evaluate the integrated route — Include extraction only where it belongs in the project design.
  4. Define the finished product — Connect refining scope to the buyer’s oil specification.

Build the equipment shortlist

Preparation equipment · Press equipment · Extraction equipment · Refining equipment

Estimate on a common basis

Compare energy, oil recovery and cake value on a common input basis. A pre-press residual-oil figure cannot be compared directly with a finished full-press cake target.

Size seed throughput · Estimate pressing output · Prepare the budget · Compare oil-and-cake economics

Read the measurement definitions before comparing percentages.

Request comparable supplier information

Browse the relevant equipment category: Oil Press Machines · Solvent Extraction Machines · Refining Machines. Directory inclusion is not a project-fit approval.

  • Identify the feed, daily input and operating hours; state whether the rate is raw seed, kernels or finished oil.
  • Specify the oil product and cake or meal acceptance criteria, including the test method and moisture basis.
  • List included preparation, handling, utilities, finishing and packaging equipment; identify exclusions.
  • Request a trial or engineering balance for the proposed route, with losses, consumables, maintenance and acceptance conditions stated.

Basis for this route

AOCS explains pre-pressing followed by extraction for canola/rapeseed. FAO notes that thin-coated seeds such as rapeseed can be processed without decortication. AOCS: Solvent extraction; FAO: extraction principles.

Route guidance reviewed 2026-11-01. The linked technical sources support the stated process principles, not every numerical range elsewhere on this page or any supplier capability.

↑ Project stages and downloads

Resolve the route before comparing quotations

  • Identify rapeseed / canola feed and the intended oil and cake / meal products.
  • Compare full pressing against pre-pressing plus cake extraction with the same feed and operating hours.
  • Agree conditioning, oil treatment and any downstream extraction / meal-treatment boundary.

Use the stage finder below to separate preparation, extraction, oil finishing, packaging and residue treatment. A profile may appear because only one of these duties is documented; require a named model and equipment schedule for your actual feed.

Find stage references · Read the complete processing route

Route choices, material streams and equipment handovers

Compare the intended cold/conditioned mechanical route with full pressing or a selected prepress/extraction arrangement on one feed and product basis.

Qualitative route interpretation and editorial buyer/supplier/site-team questions, not a selected plant design, P&ID, operating recipe, mandatory equipment list or accepted performance. Existing indicative figures remain context only. General technical references do not validate supplier crop/model suitability; inherited product scopes and review dates remain unchanged.

Track these streams separately

  • Prepared seed → the selected press duty → press oil and cake; repeated pressing and solvent extraction are distinct downstream choices.
  • If cake extraction is chosen, name extracted oil, treated meal and recovery streams separately from first-press oil/cake.
  • Refining side streams follow the selected oil-treatment sequence. Do not copy a sunflower wax-treatment requirement without actual-oil justification.

Confirm these handovers

  • Resolve seed preparation, thermal history and whether the quoted press is a prepress or final-press duty.
  • Define interstage cake transfer, weighing and sampling for the chosen route.
  • Agree clarification/refining/storage battery limits against the required oil outlet and utilities.

Equipment categories and subtype scope · Supplier references by process stage · Existing interface responsibility matrix · Quote and test-data comparison

Equipment and subtypes for this Rapeseed / canola route

Use this map to distinguish process duties, equipment alternatives and conditional branches. The linked equipment guides expose existing supplier families and their exact reviewed scope; none is selected or approved here.

Editorial equipment taxonomy and project-selection questions, not a plant design, mandatory machine list, supplier ranking or crop/model performance approval. Product names, scope and source notes are inherited unchanged from existing reviewed supplier references; supplier-level crop relationships must not be promoted to product-level suitability. Current supply and project configurations require direct confirmation.

Preparation equipment

Define the actual seed and prepared feed. Discuss flaking/extrusion only for the selected train; do not assume sunflower-style dehulling is a required step.

Compare / define first: Cleaning, destoning and metal removal, Cookers and conditioners.

Conditional branches or alternatives: Cracking mills, Flaking mills, Dehulling / groundnut shelling, Oilseed extruders, Roasting equipment.

Mechanical pressing

Compare full-press and prepress/extraction duties using a consistent seed basis; cold-press and heat-conditioned routes need distinct configuration discussions.

Compare / define first: Full-press / final-press screw equipment.

Conditional branches or alternatives: Prepress screw equipment, Batch hydraulic presses.

Solvent extraction and recovery

Include cake extraction and its supporting systems only for the selected prepress/extraction branch; confirm meal and recovery scope together.

Compare / define first: None imposed by this map.

Conditional branches or alternatives: Solvent extractors, Meal desolventizer / toaster, Meal dryer / cooler, Miscella distillation equipment, Solvent recovery and associated systems.

Clarification and filtration

Choose press-oil clarification alternatives on representative oil; specify refining separation independently if the refining branch is selected.

Compare / define first: Plate / plate-and-frame filters, Pressure-leaf filters, Press-oil decanters.

Conditional branches or alternatives: Disc-stack / refining separators.

Refining and finishing

Compare the required pressed-oil or refined-oil outlet. Any dewaxing/winterization decision needs actual-oil and product-target justification, not a default sunflower specification.

Compare / define first: None imposed by this map.

Conditional branches or alternatives: Degumming and phase-separation equipment, Neutralization, washing and drying equipment, Bleaching vessels and spent-media separation, Deodorization and vacuum systems, Dewaxing / winterization equipment.

Material transfer

Match seed, cake and meal transfer duties to the chosen pressing/extraction train.

Compare / define first: Elevators, screws and belt conveyors.

Conditional branches or alternatives: None imposed by this map.

Seed and oil storage

Distinguish seed lot, crude-oil and released finished-oil storage and sampling boundaries.

Compare / define first: Seed bins and silos, Crude and finished-oil tanks.

Conditional branches or alternatives: None imposed by this map.

Filling and packaging

Confirm package/outlet first, then compare dosing and closure equipment against actual oil and containers.

Compare / define first: None imposed by this map.

Conditional branches or alternatives: Piston / volumetric oil fillers, Net-weight oil fillers, Capping and closure handling.

Existing representative enquiry example: Farmet CP2 — two-stage cold-pressing enquiry example. Request press model, count and revision for both stages, not only the CP2 name. Do not import the FS4015 machines from a historical project or the FE 500 / FS 350 pairing from EP1. Confirm your crop lot and chosen cold-press definition.

Explore the complete equipment taxonomy · Find supplier references by stage · Continue to the existing equipment enquiry

FIND · COMPARE · PREPARE

Find supplier references by processing stage

Browse 156 supplier profiles and 361 published product/process references. A source review means the published offering was read, not that current supply or your crop configuration has been verified. Stage filters describe documented duties; read the route note and individual product scope together.

More document links and evidence guidance

How evidence is grouped and what to request next. Source categories describe the material reviewed; they are not supplier grades.

Prepare an equipment scope and test-data request.

Compare quotations and test records on a common basis.

Agree interface responsibilities and delivery records.

Plan a representative trial and request FAT/SAT deliverables.

Prepare dispatch, site startup and issue-closeout records.

Compare scope and prepare an enquiry

0 of 3 profiles selected

Loading supplier references… The complete directory remains below.

The download is an editable draft with source links and blank project fields. It sends no enquiry. Related brand profiles may share a group or sales channel: CPM / Crown, BEST / ABC references and the Huatai branding on Oil-Press-Machine.com need separate identity checks.

Read the complete original reference list · Understand listing status · Check measurement bases

Public evidence: configuration and test-record follow-up

These additions qualify public supplier evidence. They do not establish stock, a buyer-material result, serial-number traceability or signed FAT/SAT acceptance. Requests below are editorial procurement questions, not supplier promises. Existing dossiers and source limits remain applicable.

Continue with the equipment enquiry, quote/test comparison and trial and acceptance plan.

Reviewed 2026-11-04. No supplier outreach or buyer trial is claimed in this update.

↑ Project stages and downloads

Official-source supplier references for this route

Compare these documented product/process offerings with your project brief. They are reference entries, not ranked recommendations. A stage-level connection does not mean the supplier has approved your complete line.

  • Myande Group — Preparation, extraction and refining
  • Desmet — Pre-pressed cake extraction and oil refining
  • Farmet — EP2 or CP2 configuration comparison
  • Anderson International — Dox-Hivex preparation and Lion pressing
  • Alfa Laval — Stage-level connection: separation during oil finishing; crop-specific selection remains to be confirmed
  • Bühler Group — Preparation stage: confirm the canola/rapeseed feed and flaking duty
  • Kumar Metal Industries — Stage-level reference: compare full pressing and an integrated extraction project
  • French Oil Mill Machinery — Stage-level full-press/pre-press comparison; confirm the seed-specific scope
  • Andreotti Impianti — Preparation, pre-pressed cake extraction and refining-stage references
  • Mectech Process Engineers — Official canola-oil refining offering; confirm the rapeseed/canola grade
  • Reinartz — Official AP range reference with rapeseed-specific rating headings; no ratings copied
  • HF Press+LipidTech / Harburg-Freudenberger — Stage-level pressing-system comparison; confirm the canola/rapeseed configuration
  • Olexa — Official rapeseed pressing reference: choose the product and pressing mode first
  • GEA — Stage-level oil-refining separation reference; confirm the oil specification
  • Flottweg — Stage-level oil clarification and refining-separation reference
  • Muez-Hest — Stage-level extraction/refining reference; confirm the chosen route and oil grade
  • N&T Engitech — Stage-level plant/pressing reference; obtain explicit canola/rapeseed configuration confirmation
  • Tinytech Plants — Official expeller and mini-mill tables explicitly list rapeseed / canola. Discuss conditioning, mechanical extraction and oil filtration as separate duties.
  • Brissun Technologies — Refining-stage reference only. The cited crop-specific pages do not establish a rapeseed / canola configuration; request a separate proposal.
  • Gianazza International — Stage-level refining reference; confirm the crop-specific design and required treatment.
  • Serac — Finished-oil packaging stage only. Confirm oil viscosity and temperature, container, closure and food-contact requirements; seed extraction and refining are outside this reference.
  • E-PAK Machinery — Finished-oil packaging stage only. Confirm oil viscosity and temperature, container, closure and food-contact requirements; seed extraction and refining are outside this reference.
  • Accutek Packaging — Finished-oil packaging stage only. Confirm oil viscosity and temperature, container, closure and food-contact requirements; seed extraction and refining are outside this reference.
  • ABC Machinery — The screw-press application list explicitly names rapeseed / canola. Discuss pressing, optional cake extraction and refining as distinct scopes.
  • CPM — Official canola / rapeseed preparation route includes conditioning and flaking. Do not infer that soybean cracking is required for this small seed.
  • HUM Oil & Fat Technologies — Explicit NYP canola reference; agree conditioning and whether the process finishes at pressing or continues to extraction.
  • Henan Huatai — Official flaking and extractor pages name rapeseed; agree softening, flaking and the extraction feed condition.
  • Henan Doing — The official expeller application list names rapeseed. Confirm the current crop-specific configuration and distinguish pressing from solvent extraction and refining.
  • TäbyPressen / Skeppsta Maskin AB — Explicit rapeseed reference in the press pages and oil-filter example. The filter source requires settled oil before filtration.
  • Crown / CPM Crown — Official DT and DC pages explicitly name canola / rapeseed; confirm pre-press cake preparation and the downstream meal specification.
  • Gagan International — Pressing, extraction and refining stage references only. The selected crop list names mustard, which is not treated here as proof of a rapeseed / canola configuration.
  • Rajkumar Agro Engineers — The official REC series description explicitly names rapeseed. Mustard references on other models are not used as canola evidence. Confirm the actual model and seed preparation.
  • Ölwerk — Mechanical pressing and oil-filtration stage references only. The selected product pages do not provide a rapeseed / canola-specific configuration; ask for feed preparation, settings and an acceptance trial.
  • Neostarpack — Finished-oil packaging stage only. Match oil viscosity and temperature, bottle and closure, cleaning and food-contact requirements; these references do not establish raw-seed extraction or refining capability.
  • VKPAK — Finished-oil packaging stage only. Match oil viscosity and temperature, bottle and closure, cleaning and food-contact requirements; these references do not establish raw-seed extraction or refining capability.
  • BEST Oil Press Machinery — Pressing and refining-stage references only; confirm a rapeseed / canola configuration directly rather than relying on a generic catalogue.
  • Zhengzhou Dingsheng — The ZX18A official application list explicitly names rapeseed. Confirm pressing duty; extraction and refining are separate supply decisions.
  • Jas Enterprise — Mechanical pressing-stage reference only. The selected pages name mustard, which is not taken as proof of a rapeseed / canola setup.
  • Sharma Oil Expeller — The SOM page explicitly names canola. Confirm the selected model and filtration arrangement for the project.
  • Gobind Expeller Company — Canola / rapeseed is named in the press catalogue.
  • Shreeji Expeller Industries — Pressing-stage reference only; mustard is not treated as canola evidence.
  • Canapuglia — The Little Oil Press and Oil Press pages explicitly name rapeseed. Ask for crop-specific settings and an acceptance trial.
  • Gopal Expeller Company — Pressing and filtration-stage references only. Mustard catalogue entries are not taken as proof of rapeseed / canola suitability.
  • Oil-Press-Machine.com — Canola / rapeseed is explicitly named in the pre-pressing and refining descriptions. Select the actual process from feedstock and product requirements.
  • Seed Oil Press — The canola processing page is explicitly crop-specific; confirm seed preparation, press / filter arrangement and whether refining is required.
  • Sinoder Indutech — The press listing names rapeseed / canola; confirm an actual crop-specific proposal.
  • Spectec Techno Projects — Refining / extraction-stage reference only. Obtain a current rapeseed / canola design and equipment schedule before treating these legacy offerings as a suitable configuration.
  • Muar Ban Lee (MBL) — Conditional filtration-stage reference for rapeseed / canola oil only: the filter page mentions other extracted oils but does not explicitly name this crop. Obtain written compatibility and food-contact confirmation; the palm-kernel and copra expellers are outside this route.
  • YKL Group — Conditional residue-treatment reference alongside the rapeseed / canola route only. The selected YKL pages do not establish crop-specific equipment suitability. Confirm sludge composition and treatment duty; SRORS / dewatering is not product-oil refining, and the palm / copra presses are outside this route.

Each profile links to the official product pages and states what still needs supplier confirmation.

Rapeseed / canola: representative trial and acceptance plan

REPRESENTATIVE MATERIAL · TRIAL RECORD · FAT / SAT · HANDOVER

Rapeseed / canola: representative trial and acceptance plan

Editorial trial-planning and deliverable checklist; not a completed trial, manufacturer-issued acceptance standard, legal product limit or signed customer report.

Confirm seed identity and compare full pressing with pre-press/extraction on a consistent basis.

Download blank Rapeseed / canola trial / acceptance checklist

All sample quantities, settings, run duration/repeats, performance limits, decision rules, responsibilities and signatures remain blank for buyer, supplier and laboratory agreement.

1. Feed passport and representative sampling

  • Identify the actual rapeseed/canola variety and lot, storage history, moisture, fines and intended oil/meal markets; mustard references are not substituted.
  • Agree any chlorophyll, fatty-acid profile and meal analyses needed for the actual product; identify the laboratory method and reporting basis.

2. Planned comparisons and observations

  • Compare full-press and pre-press/cake-extraction proposals only with the same defined feed, operating hours and output specifications.
  • Record conditioning, press setup/cooling, oil and cake/meal temperatures, feed/output quantities and utility use.
  • Where refining or pigment treatment is proposed, use the actual crude oil and document before/after analyses and oil losses with the treatment boundary.

3. Outputs and the selection decision

  • Feed/oil/cake or meal balance and residual-oil reports with matching analytical and moisture bases.
  • Agreed oil-quality, chlorophyll/fatty-acid or meal reports as applicable, raw process logs and a production scale-up review.

Selection boundary: Do not transfer a mustard claim or one historical canola setup to a different crop lot, press or product specification.

Six stages of a traceable trial record
  1. T01 · Define the trial boundary and feed lot

    Record seed variety, origin/lot, storage history, intended oil and cake/meal markets, raw versus prepared-feed basis, proposed route and equipment revision. Agree quantities and sampling with the test provider; do not assume a universal sample mass.

    Retain: Approved scope, lot passport, sample plan and chain of custody.

    Scope reference: ISO 21294:2017 — oilseed sampling

  2. T02 · Establish laboratory baselines

    Identify representative laboratory samples and retained splits. Record moisture/volatile matter, analytical extractable oil and the route-specific analyses below, with method edition, units, moisture basis, laboratory and uncertainty/reporting limits.

    Retain: Sample register and feed certificates linked to the exact lot.

    Scope reference: ISO 665:2020 — oilseed moisture and volatile matter · ISO 659:2009 — oilseed oil-content reference method

  3. T03 · Agree a controlled comparison

    Choose a baseline setup and limited comparisons within the supplier-approved operating envelope. Record preparation, conditioning, screw/cage or extractor arrangement, speed, feed rate and heating/cooling. Change planned factors deliberately; do not copy another seed's recipe.

    Retain: Run matrix, configuration photographs/drawings and agreed operating ranges.

    Scope reference: French Oil — pilot trial variables and scale-up discussion

  4. T04 · Separate stabilization from the measured run

    Agree stabilization criteria, observation window and repeat runs where feasible. Log actual feed input, operating time, temperatures, drive load and utility use. Separate startup/shutdown material and downtime from the steady-run figures.

    Retain: Timestamped raw logs, calibration references, deviations and repeatability observations.

  5. T05 · Reconcile outputs and analyse matched samples

    Link oil, cake/meal, hulls, fines, water and inventory changes to the same measured period and stated balance boundary. Analyse matched output samples. Distinguish total mass imbalance, analytical residual oil and recovered product oil; do not call every unaccounted kilogram oil loss.

    Retain: Mass and oil-balance workbook, retained samples and laboratory reports.

    Scope reference: ISO 734:2023 — oil content of oilseed meals · ISO 660:2020 — acid value and acidity · ISO 3960:2017 — peroxide value

  6. T06 · Review scale-up and define the next gate

    Report the selected setup, result ranges, excluded conditions, utility assumptions and remaining uncertainty. Link the pilot configuration to the proposed production equipment. A representative trial supports selection; it does not itself release a commercial plant.

    Retain: Signed trial review, production-scope proposal and agreed FAT/SAT plan.

    Scope reference: French Oil — oilseed equipment and customer-material trials

Laboratory methods: select the matrix and edition

Only public publisher scopes are summarized. The laboratory must select the applicable full method/edition, actual matrix, calibration and reporting limits. Revision drafts are not treated as published replacements.

ReferenceRequested measurementScope limit
ISO 21294:2017Oilseed sampling planPublished edition; revision draft is separate. Agree lot and sampling scope.
ISO 665:2020Oilseed moisture and volatile matterRecord method edition and basis; a quick-meter result needs appropriate calibration.
ISO 659:2009Analytical extractable oil in oilseedsNot production recovery. Sunflower sample preparation has an additional moisture consideration.
ISO 734:2023Residual extractable oil in pressed or extracted mealsConfirm meal matrix and moisture basis; compounded products are excluded.
ISO 660:2020Oil acid value / acidityState acid value or calculated-acidity basis; results are not acid-species-specific.
ISO 3960:2017Oil peroxide valueRecord sample handling/time; this result alone does not establish shelf life.

Quality-measurement context: Canadian Grain Commission — oilseed quality methods. Confirm the current laboratory method for chlorophyll, fatty-acid or other requested analyses; this overview does not set this project's product limits.

FAT, SAT and handover: eight delivery groups

These are editorial document requests to agree with the buyer, supplier and laboratory. They are not a manufacturer-issued test standard or a completed customer report.

ID / whenDelivery groupContent to agree and retain
D01
Before testing / FAT
Approved scope and acceptance matrixContracting/manufacturing parties, equipment and revision list, included/excluded preparation, extraction, oil treatment, packaging and utilities; each criterion with method, units, basis, agreed limit, witness and decision rule.
D02
Before and during trial
Feed and sample traceabilityLot/variety and preparation history, sampling plan, chain of custody, sample IDs, retained splits, feed certificates and actual tested quantities.
D03
Before measured tests
Measurement and configuration recordsInstrument IDs and suitable calibration records, sampling locations, laboratory scope, machine settings/revisions, software/recipe versions where applicable and approved operating envelope.
D04
Factory acceptance test (FAT)
Witnessed factory test recordApproved test procedure, actual test medium/feed, checks possible at the factory, raw results, limitations and deferred site-only tests. Record whether it was dry, simulated or actual-feed testing; they are not interchangeable.
D05
Trial / FAT / SAT
Raw data and analytical packageTime-series run logs, quantities and mass/oil-balance boundaries, utilities, sample-linked lab reports, units and moisture basis, uncertainty/reporting limits, calculations and repeat-run variability.
D06
Before release / after retest
Deviation and retest registerCriterion-by-criterion results, discrepancies, agreed actions, owners/dates, authorized concessions where applicable, retest evidence and closure. An unresolved item must remain visible.
D07
Site acceptance test (SAT)
Site installation and performance recordInstalled equipment/revision checks, actual site utilities and feed, agreed commissioning and performance tests, product/cake/meal results, witnessed data and outstanding work. A factory demonstration does not replace site acceptance.
D08
Handover
Authorized release and operating fileAuthorized buyer/supplier decisions and signatures, agreed performance scope and exceptions, as-built documents, operating/cleaning/maintenance guidance, training, wear/spare-parts schedule and service contacts.

Published implementation example: Neostarpack — sample evaluation, FAT and site testing workflow. This example concerns packaging; it does not validate a seed-processing line or prove signed acceptance.

Fields for each agreed acceptance criterion

Criterion and matrix · method/edition · sample IDs · unit and analytical/moisture basis · agreed limit and decision rule · actual result · uncertainty/reporting limit · deviation/retest · authorized decision/date.

Keep the result and sign-off fields blank until the actual test and authorized review are completed. Record site-only tests separately from factory dry or simulated checks.

Follow the documented trial-support scope

These existing profiles offer source-linked support descriptions; confirm the actual seed, equipment, samples, availability and written deliverables. They are not independent trial-site counts or endorsements.

Return to the processing route · Review evidence and open requests · Compare supplier scope and prepare a brief

↑ Project stages and downloads

Rapeseed / canola equipment enquiry

EQUIPMENT SCOPE · TEST DATA · REQUEST FOR QUOTATION

Rapeseed / canola equipment enquiry

Buyer-editable equipment-scope and test-data requests. Representative catalogue examples are starting points for an enquiry, not a supplier ranking, final size selection, quotation, order or accepted performance.

Farmet CP2 — two-stage cold-pressing enquiry example

Farmet presents CP2 as first-stage and final pressing with oil separation/filtration and FIC controls, and identifies rapeseed/canola among its applications. CP2 is a configured technology; it does not identify a universal fixed press model.

Confirm before selection: Request press model, count and revision for both stages, not only the CP2 name. Do not import the FS4015 machines from a historical project or the FE 500 / FS 350 pairing from EP1. Confirm your crop lot and chosen cold-press definition.

Download Rapeseed / canola equipment / test-data RFQ

Published facts are limited to the linked official catalogue/service descriptions. All scope lines, tests, commercial terms and acceptance requests below are editorial questions for written agreement; current supply, crop fit, trial access and results remain unconfirmed. No enquiry is sent.

Define the quoted process boundary

Initial enquiry: actual rapeseed/canola feed through two mechanical press stages to clarified oil and cake. Temperature stabilization, cleaning, optional dehulling, oil treatment and storage are separate scope decisions. No solvent line is implied.

Buyer inputs to complete before an enquiry
  • Project / site / country and intended commissioning date: ____________________
  • Actual oilseed variety/lot, raw or prepared feed, moisture and analytical oil basis: ____________________
  • Required daily input, operating hours, turndown and feed variability: ____________________
  • Oil and cake/meal destinations, specifications and required analyses: ____________________
  • Available space, utilities, electrical supply and local requirements: ____________________
  • Requested process boundary, optional stages, buyer-supplied equipment and interfaces: ____________________
  • Representative sample quantity/shipping terms to agree with test provider: ____________________
  • Buyer technical/commercial contact and response deadline: ____________________

Six equipment-scope lines for the supplier response

For every line, request model/count/revision, inclusion or option status, interface owner and an itemized price reference. Inclusion is to be agreed; these lines are not the manufacturer’s standard delivery list.

ID / equipmentRequest in the quotation
E01 · Reception, cleaning and temperature stabilizationItemize feed bin, cleaning, weighing and optional stabilization/dehulling. Define actual incoming seed range and the supplier-approved response to low-temperature feed.
E02 · First-stage press bankSpecify each press model/count, feeder, screw/cage configuration, drive/control and first-stage cake/oil measurement points. State redundancy and turndown assumptions.
E03 · Interstage transfer and final press bankSpecify cake conveying, final press model/count and settings, interstage sampling and bypass/recycle rules. Define how the two stages form the offered operating envelope.
E04 · Oil separation and filtrationItemize settling/separation, pumps, filter type/consumables and solids handling; distinguish each stage oil stream from blended clarified oil and any treatment/storage option.
E05 · Cake and product treatment interfacesDefine final cake cooling/conveying/packing and any refining/pigment-treatment option on actual crude oil; request separate scopes for additional product claims.
E06 · FIC and site servicesRequest FIC hardware/software and data-export scope, utility and foundation loads, local electrical interfaces, wear parts, installation/training and factory/site test allocation.
Eight test-data requests linked to D01–D08

Request editable raw files plus traceable laboratory reports, not only a summary video or catalogue percentage. The linked trial plan supplies method-scope references; the supplier and laboratory must agree the actual method and acceptance criteria.

ID / data requestFields to provideBasis and delivery link
R01 · Offered equipment and trial-machine mappingRevision-controlled equipment schedule; model/count/serial or trial ID; screw/cage/die, drive/control and option list; differences between trial and production build.Supply drawings/BOM and a written scale-up/uncertainty note; identify every untested assumption.
D01 / D03
R02 · Feed, sampling and laboratory baselineLot/cultivar/storage, preparation, moisture/volatile matter and analytical extractable oil; sample register, retained splits, method edition and lab identity.State raw/prepared feed, units and wet/dry basis. Analytical extractable oil is not production oil recovery.
D02 / D05
R03 · Measured-run raw dataTimestamped feed, run/stabilization periods, downtime, temperatures, load and utilities, calibration references and planned repeats.Request editable CSV/XLSX plus run/configuration IDs; separate startup and steady operation, and define kg/h and kWh/t denominators.
D03 / D05
R04 · Matched products and balance workbookFeed, oil, cake and any hull/fines/reject/water streams; inventory changes and recycle; matched oil/cake samples and residual-oil results.Request editable mass/oil calculations and laboratory reports with method/basis/uncertainty; distinguish filtered oil, crude oil and analytical oil.
D02 / D05
R05 · Performance offer and factory/site decision matrixFor each proposed guarantee: value/unit, feed envelope, run duration, method, basis, decision rule, witness/authority, deviations/retest and FAT versus site-only SAT allocation.Ask supplier to separate indicative estimates from contractual offers; limits, actual results and signatures stay blank until agreement/testing.
D01 / D04 / D06 / D07 / D08
R06 · Two-stage operating and mass balanceFirst-stage and final-stage feed/output samples, oil/cake masses, configurations, actual settings and recycle/hold-up observations.Report stage and overall balances on one declared feed/moisture basis; do not sum recycled material as fresh input.
D03 / D05
R07 · Cold-press temperature evidenceIncoming seed, stabilization if used, stage oil/cake temperatures and ambient/utility conditions over the measured period.Agree measurement points and product definition before testing; the technology name is not an accepted temperature guarantee.
D01 / D03 / D05
R08 · Oil and meal/cake market analysesActual cultivar/lot, chlorophyll/fatty-acid and cake analyses where requested, method/edition, matrix, units, sample IDs and laboratory results.Do not replace rapeseed/canola data with mustard data or one historical project. Additional treatment requires a separate actual-oil test.
D02 / D05 / D07
Commercial terms, service and a comparable offer
  • Itemized base equipment, optional packages and buyer-supplied exclusions
  • Trial fee, required sample quantity, booking, shipping/return and report access terms
  • Equipment price/currency, quote validity, named delivery place and proposed Incoterms edition/rule
  • Production/delivery schedule and installation/commissioning responsibilities
  • Payment milestones, warranty, service and consumable/wear-part scope
  • Utility requirements, drawings/document language, controls/data-export and training
  • Proposed performance terms and FAT/SAT protocol; deferred checks and retest responsibilities
  • Customer-authorized comparable reference and available signed records, with permission and confidentiality limits

Response fields for each criterion: Offered model / quantity / revision · Included / optional / excluded / buyer-supplied, plus interface owner · Value / unit / feed and moisture basis / method and edition · Document ID / date / raw-data link / laboratory / calibration · Indicative or contractual / limits to agree / deviations / open questions.

Keep proposed values separate from agreed guarantees, measured results and authorized release. Record open items, responsible parties, due dates and deferred site tests.

Official catalogue and trial-service basis

Official pages reviewed 2026-11-03. These sources support the stated catalogue/service scope, not the editorial inclusion list, agreed tests, booking, stock or signed acceptance.

Existing supplier evidence and limits · Trial method scope and D01–D08 delivery register · Processing route · Compare documented suppliers

↑ Project stages and downloads

Rapeseed / canola quotation and test-data comparison

COMMON BASIS · THREE OFFER COLUMNS · EVIDENCE AND OPEN ITEMS

Rapeseed / canola quotation and test-data comparison

Blank buyer comparison framework for up to three offers on the same agreed route and feed basis. It contains no supplier replies, quoted prices, measured results, automatic scores or acceptance decisions.

Editorial comparison questions reuse the existing source-bounded RFQ and trial plans. No new supplier capability or test-result claim is introduced. A catalogue description, a quotation, raw test data, a laboratory report and an authorized FAT/SAT decision remain separate evidence types.

Download blank Rapeseed / canola comparison CSV · Column and status guide (TXT)

Offer A, B and C are blank labels. Complete the 25-column CSV with original values/units, each offer’s reporting basis, evidence type and source ID/date; use the separate status, gap/action, owner, due date and decision-reference columns. The page below previews the same 41 criteria; its empty cells contain no supplier response.

Before comparing: seven common-basis rules
  1. Complete B01–B08 before treating prices or performance as comparable. The common format does not make different crops, process routes, capacities or output specifications equivalent.
  2. Keep each offer’s original value/unit, reporting basis, evidence type and source ID/date. Put any buyer conversion/reconciliation in the separate gap/action field with its assumptions; retain the original.
  3. Leave unknowns blank and flag missing data; absence is not zero, compliance, failure or proof that a supplier lacks the capability.
  4. Use row statuses to manage clarification, not to rank supplier quality. Comparable on an agreed basis is not passed acceptance or a buying recommendation.
  5. Check inclusions and cost boundaries before totals; separate quoted amounts from buyer estimates, taxes/freight/installation assumptions and any recorded currency conversion.
  6. Keep proposed guarantees, agreed criteria, actual results, deviations/retests and authorized sign-off separate. FAT simulation and a site SAT cover different scopes.
  7. Record a responsible person, due date and decision reference for every unresolved item. No enquiry is sent and no file is uploaded by these downloads.
Common project and reporting basis · 8 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
B01 · Offer identity and revision

Buyer project / commercial response
D01

Record legal supplier/manufacturer, offer ID/date/revision, validity and contact for each A/B/C column. Keep revised and superseded offers traceable.———
B02 · Actual feed and lot basis

Buyer inputs / R02
D02

State crop/cultivar/lot, raw or prepared feed, moisture, hulls/fines and analytical oil basis. Do not compare different lots or preparation as equivalent without an agreed reconciliation.———
B03 · Common process boundary

E01–E06 / buyer boundary
D01

Define the same inlet and outlet, included stages, optional packages, buyer-supplied items, recycles and exclusions before comparing prices or results.———
B04 · Input rate and operating time

Buyer inputs / R03–R04
D01 / D05

Separate seed/kernel input, crude or filtered oil output and cake/meal. State units, daily operating hours, downtime and wet/dry basis; a catalogue crushing rate is not oil output.———
B05 · Product and analysis specification

Buyer inputs / R02 / R05
D01 / D05

List intended oil/cake/meal destinations, agreed quality criteria, matrices, method editions, units and reporting limits. Blank or unmatched specifications remain open items.———
B06 · Site and utility boundary

Buyer inputs / equipment scope
D01 / D03 / D07

Use the same voltage/frequency, available heat/cooling, civil/installation interfaces and utility cost boundary. Separate installed drive rating from measured consumption.———
B07 · Trial versus production configuration

R01
D03 / D07

Record actual trial machine and offered production model/count/revision, configuration differences and the written scale-up assumptions. A pilot result does not release a production line.———
B08 · Measured-run and sampling window

R02–R05
D02 / D03 / D04 / D05 / D07

State stabilization, measured period, repeats, sampling times, retained samples and calibration references. Separate factory simulation, actual-feed test and site operation.———
Equipment inclusion and interfaces · 6 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
E01 · Reception, cleaning and temperature stabilization

E01
D01 / D03

Itemize feed bin, cleaning, weighing and optional stabilization/dehulling. Define actual incoming seed range and the supplier-approved response to low-temperature feed. Compare model/count/revision, inclusion status and interface owner.———
E02 · First-stage press bank

E02
D01 / D03

Specify each press model/count, feeder, screw/cage configuration, drive/control and first-stage cake/oil measurement points. State redundancy and turndown assumptions. Compare model/count/revision, inclusion status and interface owner.———
E03 · Interstage transfer and final press bank

E03
D01 / D03

Specify cake conveying, final press model/count and settings, interstage sampling and bypass/recycle rules. Define how the two stages form the offered operating envelope. Compare model/count/revision, inclusion status and interface owner.———
E04 · Oil separation and filtration

E04
D01 / D03

Itemize settling/separation, pumps, filter type/consumables and solids handling; distinguish each stage oil stream from blended clarified oil and any treatment/storage option. Compare model/count/revision, inclusion status and interface owner.———
E05 · Cake and product treatment interfaces

E05
D01 / D03

Define final cake cooling/conveying/packing and any refining/pigment-treatment option on actual crude oil; request separate scopes for additional product claims. Compare model/count/revision, inclusion status and interface owner.———
E06 · FIC and site services

E06
D01 / D03

Request FIC hardware/software and data-export scope, utility and foundation loads, local electrical interfaces, wear parts, installation/training and factory/site test allocation. Compare model/count/revision, inclusion status and interface owner.———
Quotation, commercial terms and cost boundary · 8 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
C01 · Itemized base equipment, optional packages and buyer-supplied exclusions

Commercial response 1
D01 / D08

Compare base price, itemized options, exclusions and buyer-supplied costs on one scope; keep supplier quotations separate from buyer estimates. Do not double-count packages or treat an empty cost as zero.———
C02 · Trial fee, required sample quantity, booking, shipping/return and report access terms

Commercial response 2
D01 / D08

Keep test fee, sample quantity/handling, shipping/return, booking, report access and any confidentiality terms distinct from equipment cost.———
C03 · Equipment price/currency, quote validity, named delivery place and proposed Incoterms edition/rule

Commercial response 3
D01 / D08

Retain original currency, price unit, delivery place/rule and validity. Any buyer conversion needs its date, source/rate and cost boundary recorded separately; this template supplies no exchange rate or landed-cost total.———
C04 · Production/delivery schedule and installation/commissioning responsibilities

Commercial response 4
D01 / D08

Compare the same delivery and startup milestones, site readiness assumptions, travel/logistics and the responsible party for each activity.———
C05 · Payment milestones, warranty, service and consumable/wear-part scope

Commercial response 5
D01 / D08

Separate payment milestones, warranty conditions, service response and spare/wear parts. Record unresolved terms rather than assuming equal coverage.———
C06 · Utility requirements, drawings/document language, controls/data-export and training

Commercial response 6
D01 / D08

Compare document/control/data-export scope, utility requirements, drawings/language and operator training on the agreed project boundary.———
C07 · Proposed performance terms and FAT/SAT protocol; deferred checks and retest responsibilities

Commercial response 7
D01 / D08

Distinguish indicative estimates from proposed contractual commitments, agreed limits, measured results and authorized release. Record FAT/SAT allocation and retest responsibility.———
C08 · Customer-authorized comparable reference and available signed records, with permission and confidentiality limits

Commercial response 8
D01 / D08

Record permission, scope, crop, configuration and date for a comparable customer reference. Catalogue text, a testimonial or a photo is not a signed project acceptance dataset.———
Test records and reporting basis · 8 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
R01 · Offered equipment and trial-machine mapping

R01
D01 / D03

Revision-controlled equipment schedule; model/count/serial or trial ID; screw/cage/die, drive/control and option list; differences between trial and production build. Supply drawings/BOM and a written scale-up/uncertainty note; identify every untested assumption.———
R02 · Feed, sampling and laboratory baseline

R02
D02 / D05

Lot/cultivar/storage, preparation, moisture/volatile matter and analytical extractable oil; sample register, retained splits, method edition and lab identity. State raw/prepared feed, units and wet/dry basis. Analytical extractable oil is not production oil recovery.———
R03 · Measured-run raw data

R03
D03 / D05

Timestamped feed, run/stabilization periods, downtime, temperatures, load and utilities, calibration references and planned repeats. Request editable CSV/XLSX plus run/configuration IDs; separate startup and steady operation, and define kg/h and kWh/t denominators.———
R04 · Matched products and balance workbook

R04
D02 / D05

Feed, oil, cake and any hull/fines/reject/water streams; inventory changes and recycle; matched oil/cake samples and residual-oil results. Request editable mass/oil calculations and laboratory reports with method/basis/uncertainty; distinguish filtered oil, crude oil and analytical oil.———
R05 · Performance offer and factory/site decision matrix

R05
D01 / D04 / D06 / D07 / D08

For each proposed guarantee: value/unit, feed envelope, run duration, method, basis, decision rule, witness/authority, deviations/retest and FAT versus site-only SAT allocation. Ask supplier to separate indicative estimates from contractual offers; limits, actual results and signatures stay blank until agreement/testing.———
R06 · Two-stage operating and mass balance

R06
D03 / D05

First-stage and final-stage feed/output samples, oil/cake masses, configurations, actual settings and recycle/hold-up observations. Report stage and overall balances on one declared feed/moisture basis; do not sum recycled material as fresh input.———
R07 · Cold-press temperature evidence

R07
D01 / D03 / D05

Incoming seed, stabilization if used, stage oil/cake temperatures and ambient/utility conditions over the measured period. Agree measurement points and product definition before testing; the technology name is not an accepted temperature guarantee.———
R08 · Oil and meal/cake market analyses

R08
D02 / D05 / D07

Actual cultivar/lot, chlorophyll/fatty-acid and cake analyses where requested, method/edition, matrix, units, sample IDs and laboratory results. Do not replace rapeseed/canola data with mustard data or one historical project. Additional treatment requires a separate actual-oil test.———
FAT, SAT and handover evidence · 8 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
D01 · Approved scope and acceptance matrix

R05 / acceptance register
D01

Contracting/manufacturing parties, equipment and revision list, included/excluded preparation, extraction, oil treatment, packaging and utilities; each criterion with method, units, basis, agreed limit, witness and decision rule. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D02 · Feed and sample traceability

R05 / acceptance register
D02

Lot/variety and preparation history, sampling plan, chain of custody, sample IDs, retained splits, feed certificates and actual tested quantities. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D03 · Measurement and configuration records

R05 / acceptance register
D03

Instrument IDs and suitable calibration records, sampling locations, laboratory scope, machine settings/revisions, software/recipe versions where applicable and approved operating envelope. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D04 · Witnessed factory test record

R05 / acceptance register
D04

Approved test procedure, actual test medium/feed, checks possible at the factory, raw results, limitations and deferred site-only tests. Record whether it was dry, simulated or actual-feed testing; they are not interchangeable. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D05 · Raw data and analytical package

R05 / acceptance register
D05

Time-series run logs, quantities and mass/oil-balance boundaries, utilities, sample-linked lab reports, units and moisture basis, uncertainty/reporting limits, calculations and repeat-run variability. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D06 · Deviation and retest register

R05 / acceptance register
D06

Criterion-by-criterion results, discrepancies, agreed actions, owners/dates, authorized concessions where applicable, retest evidence and closure. An unresolved item must remain visible. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D07 · Site installation and performance record

R05 / acceptance register
D07

Installed equipment/revision checks, actual site utilities and feed, agreed commissioning and performance tests, product/cake/meal results, witnessed data and outstanding work. A factory demonstration does not replace site acceptance. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
D08 · Authorized release and operating file

R05 / acceptance register
D08

Authorized buyer/supplier decisions and signatures, agreed performance scope and exceptions, as-built documents, operating/cleaning/maintenance guidance, training, wear/spare-parts schedule and service contacts. Record document/revision, receipt/review, deviations and authorized status; no status is implied by this blank row.———
Crop-specific comparability checks · 3 rows
Criterion and linkRequired comparison basisOffer A
blank
Offer B
blank
Offer C
blank
X01 · Two press stages and overall balance

E02–E03 / R06
D03 / D05

Request model/count/revision and measured streams for both stages, including interstage recycle/hold-up. Reconcile the overall balance rather than adding recycled material as new input.———
X02 · Cold-press definition and temperature evidence

E01–E03 / R07
D01 / D03 / D05

Match incoming feed, any stabilization, measurement locations and oil/cake temperature traces to an agreed product definition; the technology name is not a temperature guarantee.———
X03 · Actual crop and product-quality analyses

E04–E05 / R08
D02 / D05 / D07

Keep rapeseed/canola variety/lot distinct from mustard; compare requested chlorophyll/fatty-acid and cake data on agreed methods, separating any additional actual-oil treatment.———
Evidence types, row status and unresolved items

Evidence type: Catalogue / service description · Supplier quotation / clarification · Raw trial record · Laboratory report · Factory FAT record · Site SAT record · Authorized decision / sign-off.

Comparison status: Awaiting response · Basis mismatch · Clarification needed · Comparable on agreed basis · Not applicable — agreed with reference.

These are worksheet labels, not supplier grades. A comparable row does not mean passed acceptance. Keep the actual document/date, basis mismatch, requested clarification, owner, due date and authorized decision separate. Missing or not-applicable entries need a reason; do not silently count them as zero or passed.

Existing equipment RFQ template · Existing trial / acceptance checklist

RFQ scope and source limits · D01–D08 delivery register · Compare documented supplier profiles · Processing route

↑ Project stages and downloads

Rapeseed / canola interface responsibility and delivery matrix

BUYER · EQUIPMENT SUPPLIER · SITE TEAM · OPEN AGREEMENTS

Rapeseed / canola interface responsibility and delivery matrix

Editorial interface-confirmation matrix linking buyer, equipment supplier and site team questions to deliverables. It proposes topics to agree; it does not assign contractual duties, authorize site work, approve a design or record completed acceptance.

Role labels are discussion headings, not agreed RACI assignments. Parties may delegate work; actual legal parties, responsible owner, reviewer/approver, scope, due dates and sign-off remain blank until project agreement. Existing catalogue/service evidence does not establish who performs a project interface.

Download blank Rapeseed / canola interface register · Interface guide (TXT)

The three columns below are confirmation questions. They are not assigned duties. Complete actual parties, agreed scope, owner/checker/approver, due date, evidence and sign-off in the downloaded register.

Seven rules for an agreed interface
  1. Name actual parties and package boundaries before assigning an owner. Keep proposed questions separate from the signed scope and its revision.
  2. Record who provides the input, who supplies/installs/connects the item, who checks it and who has decision authority; they may be different parties.
  3. Use actual drawing/connection IDs, inlet/outlet conditions and included/optional/excluded status. Leave missing conditions open rather than inferring a catalogue value.
  4. Link each interface to RFQ E/R items, comparison B/E/C/R/D/X rows and the D01–D08 register. Preserve original documents and changes.
  5. Agree review points and readiness criteria before work/testing; suggested review points below are not binding milestones or universal technical limits.
  6. Separate factory dry/simulated checks, actual-feed trials, site checks, deviations/retests and authorized release. A marked document receipt is not a passed interface.
  7. Keep unresolved items with an owner, due date, required evidence and decision reference. No enquiry is sent and no project data is uploaded by these blank downloads.
Project and feed boundary · 2 interfaces
Interface / suggested reviewBuyer: confirmEquipment supplier: confirmSite team: confirm
I01 · Contracting parties, scope and interface register

Review point to agree: Before scope and layout agreement

Identify project owner, intended process/output and the people authorized to agree scope and changes. Confirm any delegated buyer role.Identify the quoting/contracting manufacturer, package boundaries, subcontracted items, exclusions and who can approve revisions.Identify installation, utilities, controls and laboratory participants; clarify which works their contracts cover.
Deliverable to agree: Agreed party list, package/inlet/outlet boundaries, interface drawings and revision/change register.

RFQ: Buyer inputs / E01–E06 · Comparison: B01 / B03 / C01 · Acceptance: D01

I02 · Feed supply, reception and product destinations

Review point to agree: Before equipment sizing and sample shipment

Define crop/cultivar/lot, input basis, availability, storage history and intended oil/cake/meal destinations; identify sample and feed providers.State accepted inlet specification, reception/weighing needs and any preparation/treatment exclusions in the offered scope.Confirm receiving/storage routes, actual transfer points, weighing access and who handles rejects or returned samples.
Deliverable to agree: Lot/feed specification, material-flow sketch, sampling ownership and product/outlet schedule.

RFQ: Buyer inputs / E01 / R02 · Comparison: B02 / B04 / B05 · Acceptance: D01 / D02

Site, electrical and utilities · 3 interfaces
Interface / suggested reviewBuyer: confirmEquipment supplier: confirmSite team: confirm
I03 · Layout, foundations, unloading and access

Review point to agree: Before civil work and equipment dispatch

Provide site constraints, access and building information; identify who commissions local civil/layout reviews and delivery reception.Provide offered equipment loads, dimensions, maintenance clearances, lifting/handling information and installation interface drawings.Confirm site measurements, foundation/anchor and access compatibility, unloading/rigging work scope and any unresolved design inputs.
Deliverable to agree: Revision-controlled layout, load/foundation interface records, delivery/installation plan and open items.

RFQ: E01–E06 / commercial response · Comparison: B03 / B06 / C04 · Acceptance: D01 / D03 / D04

I04 · Power, drives and electrical connection boundary

Review point to agree: Before electrical design freeze and energization

Confirm available supply data and which party provides upstream distribution, cables, local works and approvals for the actual site.Specify connected/operating loads, voltage/frequency, motor/drive/control scope, connection points and required commissioning checks.Confirm local design/installation responsibility, cable/termination boundaries, grounding and protective/control interface review by the responsible specialists.
Deliverable to agree: Electrical load list, connection drawings, responsibility split and recorded pre-start checks.

RFQ: E01–E06 / R01 / R03 · Comparison: B06 / B07 / C06 · Acceptance: D03 / D04 / D07

I05 · Steam, water, cooling and utility return

Review point to agree: Before utility design and actual-feed testing

Identify available utility conditions, supply reliability, metering and who supplies generation, treatment and external networks.State actual package requirements and connection/return points; distinguish included conditioning/cooling equipment from external utility systems.Confirm piping, isolation/drainage/return interfaces, instruments and installation checks within the agreed local work scope.
Deliverable to agree: Utility schedule, inlet/return boundary drawings, metering basis and any unavailable service or deferred check.

RFQ: E01–E06 / R03 · Comparison: B06 / C06 / R03 · Acceptance: D01 / D03 / D07

Material and control connections · 2 interfaces
Interface / suggested reviewBuyer: confirmEquipment supplier: confirmSite team: confirm
I06 · Material, oil, cake and optional downstream connections

Review point to agree: Before package procurement and installation tie-in

Agree process inlet/outlet, storage/packing/treatment destinations, quality targets and which optional stages belong to this contract.Identify transfer rates, connection geometry, contact-material/cleaning scope, pumps/conveyors/filters and solids-return exclusions.Confirm physical tie-ins, storage/handling and cleaning/changeover arrangements; identify gaps between separately supplied packages.
Deliverable to agree: Tie-in list and material-flow balance boundary, equipment inclusion list and interface ownership.

RFQ: E01–E06 / R04 · Comparison: B03 / B05 / E01–E06 / R04 · Acceptance: D01 / D03 / D05

I07 · Controls, instrumentation and data handover

Review point to agree: Before controls integration and FAT/SAT plan agreement

State operator/data needs, permissions, retained records and who reviews cross-package operation and site emergency/control interfaces.Define control hardware/software, instrument ranges/calibration references, signals/interlocks, data export and any remote support scope.Confirm cross-package signal responsibility, integration/testing participants, network/access arrangements and as-built documentation scope.
Deliverable to agree: Control/interface list, cause-and-effect review where agreed, calibration references, data/export sample and change log.

RFQ: R01 / R03 / commercial response · Comparison: B07 / C06 / R01 / R03 · Acceptance: D03 / D04 / D07 / D08

Installation, trials and handover · 5 interfaces
Interface / suggested reviewBuyer: confirmEquipment supplier: confirmSite team: confirm
I08 · Installation readiness, checks and commissioning support

Review point to agree: Before startup authorization

Identify site-ready date, feed/utilities/operators and the person authorized to accept readiness or approve a deferred item.State installation/startup supervision, required checks, training, travel/remote support and equipment prerequisites in the offer.Confirm installer work scope, alignment/connection records, access, utilities and the remaining pre-start checklist.
Deliverable to agree: Signed or otherwise authorized readiness record, outstanding-items list, support plan and revision-controlled installed configuration.

RFQ: Commercial response / R01 / R05 · Comparison: B06 / C04 / C06 / C07 · Acceptance: D03 / D06 / D07

I09 · Trial feed, sampling, laboratory and raw data

Review point to agree: Before sample shipment and measured trial

Agree representative lot/sample provision, test purpose, acceptance criteria, witnesses, laboratory selection and data access/confidentiality.Identify actual trial machine/settings, sample requirements, measured-run plan, scale-up limits and proposed raw-data/report deliverables.Confirm sampling access, weighing/metering, retained-sample handling, laboratory logistics and who collects each time-linked record.
Deliverable to agree: Approved run/sampling plan, chain of custody, raw files, laboratory reports, balance workbook and configuration mapping.

RFQ: R01–R08 · Comparison: B02 / B05 / B07 / B08 / R01–R08 · Acceptance: D01 / D02 / D03 / D05

I10 · Factory FAT, deviations and shipment release

Review point to agree: Before FAT and dispatch decisions

Agree factory witness/review authority, inspection medium, acceptance criteria and which site-only checks may be deferred.Propose revision-controlled FAT scope and records; identify dry/simulated versus actual-feed checks, deviations and shipment prerequisites.Confirm site-only items, installation dependencies, reception documentation and the people who will receive open/deferred issues.
Deliverable to agree: Agreed FAT protocol, actual records, deviation/retest log, deferred-site register and authorized shipment decision.

RFQ: R05 / commercial response · Comparison: C04 / C07 / R05 / D04 · Acceptance: D01 / D04 / D06

I11 · Site SAT, performance review and retest

Review point to agree: Before measured SAT and final release

Agree actual feed/operating envelope, witnesses, measurement/decision rules, retest responsibilities and release authority before the run.Confirm installed configuration, technical participation, proposed performance terms and how deviations or scale-up gaps will be addressed.Confirm actual utilities/feed readiness, measured periods, sample collection, site logs and closure/retest work responsibilities.
Deliverable to agree: Actual site run data, matched lab/balance reports, deviations/retests and authorized acceptance decision with exclusions.

RFQ: R01–R08 / commercial response · Comparison: B04 / B08 / C07 / R01–R08 / D07 · Acceptance: D01 / D05 / D06 / D07 / D08

I12 · As-built handover, training, spares and open items

Review point to agree: Before handover and closure

Identify document recipients, operating/maintenance personnel, agreed training and spares needs, warranty contacts and open-item decision authority.Identify final equipment/configuration revisions, manuals/drawings, software/data rights, spare/wear parts, training and support deliverables.Confirm as-built local interfaces, attended training, maintenance access and the owner/due date of each remaining site item.
Deliverable to agree: Handover register, training/spares records, as-built documents, unresolved-items ownership and authorized release/reference.

RFQ: Commercial response / R05 · Comparison: C05 / C06 / C08 / D08 · Acceptance: D06 / D08

Crop-specific interfaces · 3 interfaces
Interface / suggested reviewBuyer: confirmEquipment supplier: confirmSite team: confirm
I13 · Rapeseed identity and feed stabilization

Review point to agree: Before preparation design and actual-seed trial

Confirm rapeseed/canola variety/lot and incoming conditions; identify whether stabilization/cleaning/dehulling is included.Define actual feed envelope and offered stabilization/preparation scope for the CP2 or alternative configuration.Confirm reception, stabilization utilities, feed transfer, weighing and sample locations.
Deliverable to agree: Actual-crop feed schedule, preparation/stabilization boundary and lot-linked baseline records.

RFQ: E01 / R02 / R07 · Comparison: B02 / X02 / X03 · Acceptance: D01 / D02 / D03 / D05

I14 · CP2 first-stage, interstage and final press banks

Review point to agree: Before press-bank order and performance review

Confirm two-stage mechanical duty and any separately contracted extraction route or capacity change.Specify models/counts/revisions for both press banks, interstage transfer/control and trial-to-production differences; do not inherit an unrelated historical model list.Confirm cake transfer, bypass/recycle rules, both-stage oil/cake samples and actual measurement access.
Deliverable to agree: Two-bank schedule, interstage interface drawings, stage/overall balance and configuration records.

RFQ: E02–E03 / R01 / R06 · Comparison: B07 / X01 / R06 · Acceptance: D03 / D05 / D07

I15 · Rapeseed cold-press definition and oil/cake quality

Review point to agree: Before product criteria agreement and actual-oil tests

Agree product definition, temperature observation points and any requested chlorophyll/fatty-acid/cake analyses on the actual crop.Separate press performance, oil filtration and any additional actual-oil treatment; propose method/basis and measurement deliverables.Confirm temperature/sample access, filtration/solids/treatment tie-ins and matched laboratory and site records.
Deliverable to agree: Actual-lot temperature and product-quality records, method/sample IDs and any separate treatment result.

RFQ: E04–E05 / R07–R08 · Comparison: B05 / X02 / X03 · Acceptance: D01 / D05 / D07 / D08

Fields left blank for the actual agreement
  • Project / route / interface ID and revision: ____________________
  • Actual buyer / contracting supplier / site contractor or team: ____________________
  • Agreed boundary / drawing or connection ID / inclusion or exclusion: ____________________
  • Input provider / supplier / installer or connector / checker: ____________________
  • Responsible owner / reviewer / authorized approver: ____________________
  • Agreed deliverable / document ID / revision / evidence location: ____________________
  • Agreed review point / prerequisites / due date: ____________________
  • Open question / change / deviation / retest and its owner: ____________________
  • Actual completion evidence / review status / unresolved item: ____________________
  • Authorized decision / exceptions / names / signatures / dates: ____________________

Record the actual document and authorized decision; receiving a drawing or checking a box does not itself release an interface or prove acceptance.

Existing documents: RFQ scope · RFQ template · Comparison table · Comparison CSV · Trial and D01–D08 register · Trial / acceptance template.

Compare documented suppliers · Processing route · Source categories and open evidence requests

↑ Project stages and downloads

Rapeseed / canola dispatch, startup and handover review

THREE REVIEW POINTS · EVIDENCE · ISSUES AND AUTHORIZED DECISIONS

Rapeseed / canola dispatch, startup and handover review

Editorial document-readiness and issue-closeout questions for dispatch, site startup and final handover. This is a blank planning register, not an equipment operating procedure, site readiness certificate, permission to energize/start machinery or a completed acceptance decision.

The three review points and evidence requests must be agreed by the actual project parties. No supplier responsibility, mandatory milestone, technical limit, completion status or release authority is assigned by this page. Existing RFQ, comparison, interface and trial evidence boundaries remain unchanged.

Download blank Rapeseed / canola readiness / closeout register · Issue-closeout guide (TXT)

Actual owners, due dates, evidence, status and authorized decisions are blank. Agree the review points with the project parties. This register does not supply operating steps or permission to start machinery.

G01 · Before dispatch: factory records and deferred site items · 5 questions
Question / linked scopeConfirm before the agreed activityEvidence to request and review
S01 · Freeze the offered configuration and boundary

I01 / I02 / I06 / I07
RFQ: E01–E06 / R01
Comparison: B01 / B03 / B07 / C01
Acceptance: D01 / D03

Reconcile the agreed equipment, options, exclusions, actual parties and latest drawings with the quotation and interface register; record any changed assumption.Approved revision list, equipment schedule, scope/interface changes and the actual decision reference.
S02 · Review actual factory test evidence

I07 / I09 / I10
RFQ: R01 / R03 / R05
Comparison: C07 / R01 / R03 / R05 / D04
Acceptance: D03 / D04 / D05

Separate actual-feed, dry and simulated checks. Match the performed test configuration, protocol, raw records and witnesses to the agreed FAT scope; do not infer a performance pass from a video or catalogue.Actual FAT record, configuration/calibration references, raw files and documented limitations.
S03 · Carry deviations and site-only checks forward

I08 / I10 / I11
RFQ: R05 / commercial response
Comparison: C04 / C07 / D04 / D06 / D07
Acceptance: D04 / D06 / D07

Give every unresolved factory issue a document reference, proposed action, responsible party and site implication; obtain the agreed decision about retest, correction or deferral.Deviation/retest log, deferred-site list, reasons, owners/dates and authorized decision.
S04 · Confirm dispatch and receiving documentation

I03 / I08 / I10 / I12
RFQ: Commercial response
Comparison: C04 / C06 / D08
Acceptance: D04 / D06 / D08

Agree packing/identification, handling information, receiving responsibilities, delivery prerequisites, relevant documents and the person authorized to decide shipment.Packing/identification register, delivery/handling documents, site receiving plan and actual shipment decision.
S05 · Rapeseed two-bank and preparation scope

I13 / I14 / I15
RFQ: E01–E05 / R01
Comparison: B02 / B07 / X01 / X03
Acceptance: D01 / D03 / D04

Confirm actual rapeseed/canola identity, preparation/stabilization and model/count/revision for both press stages. Do not inherit an unrelated historical equipment list or mustard data.Two-bank and interstage schedule, preparation boundary and actual-crop specification.

Record actual prerequisite, owner, due date, evidence, review status, decision authority and scope/exceptions in the blank register. No review outcome is supplied here.

G02 · Before site startup: installed scope and test readiness · 5 questions
Question / linked scopeConfirm before the agreed activityEvidence to request and review
S06 · Reconcile the installed equipment and site interfaces

I03 / I04 / I05 / I06 / I07 / I08
RFQ: E01–E06 / R01
Comparison: B03 / B06 / B07 / E01–E06
Acceptance: D03 / D06 / D07

Review the actual installed configuration, drawings, connection boundaries and local installation records with the named project parties. List missing or changed interfaces for their review.Installed/as-built revision list, civil/material/electrical/utility/control interface records and unresolved items.
S07 · Confirm feed, samples, utilities and people for the planned run

I02 / I05 / I07 / I08 / I09
RFQ: R02–R04 / commercial response
Comparison: B02 / B04 / B05 / B06 / B08
Acceptance: D01 / D02 / D03 / D05 / D07

Agree actual feed lot and preparation, sample/laboratory arrangements, utility availability, metering, operator/trial support and access to time-linked raw data.Lot/sample register, agreed run plan, utility/meter/calibration references and named participants.
S08 · Review the SAT criteria and deferred factory items

I09 / I10 / I11
RFQ: R05 / R06–R08
Comparison: C07 / R05 / D06 / D07
Acceptance: D01 / D05 / D06 / D07

Before measurement, agree method/basis, observation period, decision rule, witnesses, actual scope and who reviews each deferred issue; keep proposed guarantees separate from agreed criteria.Agreed SAT protocol, criteria/method matrix, deferred-item mapping and review authority.
S09 · Record the actual readiness decision and remaining questions

I01 / I08 / I11
RFQ: Commercial response / R05
Comparison: C04 / C07 / D06 / D07
Acceptance: D06 / D07

Have the authorized project parties review missing prerequisites and deviations. Record whether an item blocks the proposed activity or is deferred under an agreed decision; the editorial checklist supplies no permission to start equipment.Actual readiness review, outstanding actions, agreed prerequisites and authorization reference with scope/exceptions.
S10 · Rapeseed stage measurements and actual seed readiness

I13 / I14 / I15
RFQ: R02 / R06–R08
Comparison: B05 / B08 / X01 / X02 / X03
Acceptance: D01 / D02 / D03 / D05 / D07

Agree incoming seed/stabilization, interstage transfer/recycle, both-stage sample/temperature points and actual crop/product analyses before the measured site run.Actual-lot run plan, stage/overall sampling map and agreed temperature/quality basis.

Record actual prerequisite, owner, due date, evidence, review status, decision authority and scope/exceptions in the blank register. No review outcome is supplied here.

G03 · Before final handover: evidence, open items and authorized release · 5 questions
Question / linked scopeConfirm before the agreed activityEvidence to request and review
S11 · Reconcile actual performance and laboratory records

I02 / I07 / I09 / I11
RFQ: R01–R08
Comparison: B04 / B05 / B07 / B08 / R01–R08
Acceptance: D02 / D03 / D05 / D07

Link site feed/configuration, raw measured periods, matched samples, laboratory methods and mass/oil balances to the agreed criteria. Keep estimates, results and scale-up assumptions distinct.SAT raw records, sample-linked lab reports, balance workbook and the actual criteria/result review.
S12 · Review correction, retest and accepted deferral evidence

I10 / I11 / I12
RFQ: R05 / commercial response
Comparison: C07 / D06 / D07 / D08
Acceptance: D06 / D07 / D08

For each issue, retain the original problem, agreed action and the evidence reviewed after correction/retest. Any remaining deferral needs its scope, owner, date and authorized decision recorded.Linked issue/action/retest records, reviewer decision, residual open-item list and approval references.
S13 · Check document, training, spares and support delivery

I07 / I08 / I12
RFQ: Commercial response
Comparison: C05 / C06 / C08 / D08
Acceptance: D03 / D06 / D08

Compare the actual as-built/manual/control-data, training, spare/wear-part, warranty and support records against the agreed delivery list; record missing documents separately from equipment performance.Handover document register with revisions/receipt/review, training/spares/support records and gaps.
S14 · Record release authority, exceptions and continuing ownership

I01 / I11 / I12
RFQ: R05 / commercial response
Comparison: C07 / D06 / D08
Acceptance: D06 / D07 / D08

Identify the people authorized to decide final handover, the actual scope and excluded/deferred items. Keep evidence and unresolved responsibilities accessible after the decision.Actual signed or otherwise authorized handover decision, scope/exceptions, open-item owners and retained document locations.
S15 · Rapeseed stage balance, temperature and quality closeout

I13 / I14 / I15
RFQ: R04 / R06–R08
Comparison: X01 / X02 / X03
Acceptance: D05 / D06 / D07 / D08

Keep stage and overall balances consistent without double-counting recycle. Review actual temperature/product-quality data and any separately scoped oil treatment against agreed criteria.Two-stage/overall balance, actual-lot temperature and lab reports and authorized decision with exceptions.

Record actual prerequisite, owner, due date, evidence, review status, decision authority and scope/exceptions in the blank register. No review outcome is supplied here.

Close an issue with evidence and an authorized disposition

  1. Log the question and its affected scope

    Keep the original issue ID/date, configuration/lot/document revision, affected interface and review point, source evidence and the question requiring a decision.

  2. Agree the decision needed before the next activity

    Have the named authorized parties state the prerequisite/evidence and whether the issue affects dispatch, the proposed site activity or handover. Any deferral needs an agreed reason, scope and review authority.

  3. Record action, owner, due date and required evidence

    Separate the action provider, responsible coordinator, reviewer and decision-maker. Record the drawing/data/correction/retest to be provided; leave unagreed assignments open.

  4. Retain correction/retest evidence and its review

    Link actual dated records to the original issue and agreed criterion/basis. A promised action, uploaded file, photograph or checked box alone is not verified closure.

  5. Record the authorized disposition and remaining obligations

    Keep the actual decision/reference, scope/exceptions, signatures or other agreed authorization, retained records and any continuing open-item owner. Do not erase the original issue after closure.

Blank issue fields and status labels
  • Project / route / review point / item or issue ID: ____________________
  • Actual parties / configuration / lot / document revisions: ____________________
  • Affected interface / RFQ / comparison / D01-D08 reference: ____________________
  • Required prerequisite / evidence / agreed decision rule: ____________________
  • Action provider / responsible owner / reviewer / authorized decision-maker: ____________________
  • Action / required document or retest / due date: ____________________
  • Actual evidence ID / revision / date / retained location: ____________________
  • Current status / unresolved gap / reason and scope of any deferral: ____________________
  • Authorized decision / exceptions / continuing owner / decision reference: ____________________
  • Names / authority / signatures / dates: ____________________

Labels to agree: Awaiting agreement · Evidence requested · Action or retest pending · Evidence under review · Deferred with authorized reference · Closed with reviewed evidence and decision · Not applicable with agreed reason. No status is preselected. Missing records remain open questions, not assumed completion or acceptance.

Related records: Interface matrix · Interface register · RFQ scope · RFQ template · Comparison table · Comparison CSV · Trial and D01–D08 register · Trial / acceptance template.

Processing route · Compare documented supplier scope · Evidence categories and open requests

↑ Project stages and downloads

Fictional filling examples and pre-submission review

FICTIONAL TEACHING EXAMPLES · MANUAL REVIEW

Fictional filling examples and pre-submission review

FICTIONAL TRAINING DATA ONLY — not a supplier test, machine/crop performance, recommended operating condition, guarantee or acceptance record. All IDs, quantities, dates, methods and source references are invented. The arbitrary sunflower route label only illustrates a category; the same exercise is shown on all four routes.

Worked teaching examples and a manual review checklist, not an automated validator. Original blank forms and real supplier/research evidence remain separate. Unresolved mismatches stay open; a completed example is not a project approval.

Download untouched blank forms · Read real supplier evidence and gaps separately

Before submitting actual project data

  1. Keep an untouched copy of the originals and record project/run/configuration/lot/period IDs. Replace every DEMO value in a fresh blank form; never submit this workbook as evidence.
  2. Check timestamps, offsets, phase and downtime; identical IDs alone are insufficient. Confirm the weighed-feed and meter intervals match.
  3. Check stream/meter boundaries, units, calibration/multiplier references, sample matrix, method edition and wet/dry reporting basis.
  4. Identify duplicated measurements, recirculation and overlapping parent/child meters before aggregation. Retain evidence of any correction and the original value.
  5. Keep unknown inputs and unavailable results visible. Obtain missing sources or trace the question into the existing issue-closeout register; do not turn blanks or invalid ratios into zero.
  6. Transfer only supported, comparable values into the quote/test comparison while retaining original units and sources. Agree actual test criteria and authorized FAT/SAT decisions separately.

Eight fictional review cases

Match meter and weighed feed windows

DEMO-MATCH · invented values, not actual performance

Fictional readings 100 to 108 kWh, factor 1 and 1000 kg feed over the same hour give 8 kWh and 8 kWh/t. This arithmetic says nothing about a real process, throughput, oil recovery or plant acceptance.

Next action: Check clock, configuration, lot, stream and boundary before transferring a result to the comparison.

Invented reference: DEMO-METER-MATCH / DEMO-FEED-1

Same ID, different timestamps

DEMO-TIME · invented values, not actual performance

The meter window 00:30–01:30 differs from feed 00:00–01:00. A repeated Period ID does not make the denominator valid. Do not report a matched kWh/t.

Next action: Request corresponding feed and meter observations for exactly the same interval; preserve the original row.

Invented reference: DEMO-METER-TIME

Unknown multiplier is not one

DEMO-FACTOR · invented values, not actual performance

The blank multiplier is unknown. Do not silently reuse the factor from another meter or return zero. No normalized result is available from this row.

Next action: Obtain the applicable multiplier and its source before calculating.

Invented reference: DEMO-METER-FACTOR

End reading below start

DEMO-RESET · invented values, not actual performance

The invented 100-to 90 readings need reset/rollover investigation. Do not report negative consumption or clamp it to zero.

Next action: Retain original readings and request a corrected, documented interval reconstruction.

Invented reference: DEMO-METER-RESET

Equal number, unequal reporting basis

DEMO-BASIS · invented values, not actual performance

Both invented sample values are 5%, but one is wet basis and one dry basis. They are not equivalent; no moisture or suitable conversion evidence is supplied.

Next action: Retain the two originals. Request comparable basis, methods and matching sample moisture before any separate conversion.

Invented reference: DEMO-NOT-A-LAB-REPORT-WB / DB

The same feed observation appears twice

DEMO-DUPLICATE · invented values, not actual performance

Two log rows reference the same 1000 kg feed observation, interval and stream. Counting both would invent 2000 kg. This exercise does not supply an oil or full mass balance.

Next action: Identify duplicates using IDs, timestamps, stream and original source; retain history and use the measured feed once.

Invented reference: DEMO-FEED-1 (duplicated)

Child meter is inside parent boundary

DEMO-OVERLAP · invented values, not actual performance

The child’s invented 3 kWh is already part of the parent’s 8 kWh. Adding both would double-count part of the boundary.

Next action: Choose a non-overlapping meter set and document included/excluded circuits; do not infer a whole-plant total.

Invented reference: DEMO-METER-MATCH / DEMO-METER-CHILD

Measured zero differs from blank

DEMO-ZERO-FEED · invented values, not actual performance

The stopped interval explicitly records zero feed and 2 kWh. Keep the stop and energy observations, but do not divide by zero or report a zero kWh/t result.

Next action: Preserve downtime. Aggregate only compatible, documented windows with a positive measured feed denominator.

Invented reference: DEMO-METER-STOP / DEMO-FEED-STOP

These are worked interpretations, not spreadsheet formulas or automatic data-validation results. Source gaps require actual evidence; no example closes a real project issue.

Compare only supported, compatible records · Keep acceptance criteria and decisions separate · Track unresolved data to closure · Project stages and downloads

↑ Project stages and downloads

Rapeseed / canola — Blank production-record forms

BLANK WORKING FORMS · RUNS, SAMPLES AND METER WINDOWS

Rapeseed / canola — Blank production-record forms

Use the same project, run, configuration, lot and period IDs across the three forms. Download the Excel workbook for all forms together or individual CSV files; complete them locally alongside the original source records.

Independent editorial collection forms. All entry cells are blank; no supplier measurement, guarantee, completed acceptance or authorized signoff is supplied. CSV files have no formulas, formatting or validation; the workbook has route/phase choice lists but no calculations. Keep original evidence files alongside the forms.

Each form has 20 blank entry rows; add rows as needed. No measured value, default meter factor, acceptance limit or approval is prefilled. The guide explains every column and the differences between blank, zero and not applicable.

Run log

One row per observation period and stream; record stopped intervals explicitly.

Sample register

One row per sample/analysis; retain the same Sample ID for additional analyses of that sample.

Energy readings

One row per meter and observation window; keep utilities and boundaries separate.

How to keep periods, units and source boundaries consistent

Create stable project, run, configuration, lot and period IDs; reuse them across all three forms. Duplicate blank rows as needed. A changed configuration or feed lot needs a new reference and a clear transition. Import ID and ISO timestamp columns as text when opening CSV to preserve leading zeros and timezone offsets.

Use timestamp offsets and a synchronized clock. A period is an observation window, not proof of continuous operation. Split rows whenever phase, lot, configuration or operating state changes; include downtime reasons and intervals.

Mass rows describe separate streams. Do not add raw and prepared feed together, count recirculation as new feed, or sum parent and child meters. Document inventory changes, rejects and the inlet/outlet boundary in the original evidence.

Sample ID may repeat for different analyses of the same physical sample. Keep matrix, method/edition, laboratory, original result/unit/basis and report/custody references together. A generic method name is not proof of matrix suitability.

Use cumulative readings in the energy form. For a valid non-reset electrical meter in kWh, energy is (end reading minus start reading) times documented multiplier. Divide by same-window weighed feed kg / 1000 for kWh per tonne. This is guidance only; the forms calculate nothing.

Do not calculate when a reading, multiplier, weighed mass, source or interval match is missing. A blank is unknown, not zero; only record zero when actually observed. Resolve resets, rollovers, invalid intervals and zero-feed periods before reporting an intensity.

Motor kW/HP is rated power, not cumulative energy. Keep electricity, steam and fuel in original units and separate rows. Any conversion to a common energy unit needs documented assumptions, boundary and separate review; no automatic conversion is provided.

Keep startup, steady, stopped and shutdown records identifiable. Comparing savings requires a matched baseline and duty; a savings claim is not total line consumption. Do not infer availability, annual capacity or acceptance from a short run.

These are internal working records. Share the completed file only through an agreed project channel; this website does not collect or send entries. Keep originals, revisions and source references; signatures and contractual criteria belong in separately agreed documents.

Use these records with the existing project documents

Project stages and complete download list

↑ Project stages and downloads

Rapeseed / canola production records: what is still needed

PRODUCTION RECORDS · PUBLISHED SCOPE AND OPEN REQUESTS

Rapeseed / canola production records: what is still needed

Read what the reviewed public material actually establishes before requesting production records. These are editorial evidence requests, not supplier rankings or agreed acceptance criteria.

No configuration-matched raw continuous-run log, lot-linked laboratory pack or whole-line metered energy report was obtained for these four enquiry examples. This describes this review, not the existence of private supplier records. Catalogue ratings, service descriptions, customer narratives and planned capacities remain distinct.

Farmet CP2 — two-stage cold-pressing enquiry example

Evidence reviewed: Technology description and historical installation announcement

Farmet’s 23 May 2023 announcement describes a mainly-rapeseed CP2 installation with FS4015 presses, automatic filtration and FIC. It states a planned capacity of up to 300 tonnes of seeds per day. CP2’s technology page separately describes two pressing stages and optional preparation equipment.

Limit: A planned daily capacity is not observed production. FS4015 belongs to that historical project; it does not select the press sizes or count for the current CP2 enquiry. FIC availability alone does not supply run or meter exports.

Official sources, dates and review scope

Reviewed 3 November 2026. Sources were retrieved directly; a successful page response is not independent validation of its performance claims. The customer account is hosted by the equipment supplier.

farmet cp2

farmet project

farmet trial

Continuous run

Original matched record not obtained in this review

Request the offered first/final press models and counts, interstage sampling, run hours/stops, actual weighed seed and separate oil/cake streams. Keep the historical FS4015 project outside the offered bill unless explicitly selected.

Representative lot

Original matched record not obtained in this review

Request variety/lot, seed temperature, moisture/oil analyses, preparation and both-stage sample IDs. Link any cold-press or finished-oil claim to agreed temperature locations and analytical records.

Whole-line energy

Original matched record not obtained in this review

Request synchronized meter and FIC exports for both press stages, conveyors, stabilization, separation and filtration. Identify omitted site loads, measured tonnes and startup/steady intervals.

Existing supplier evidence and limits · Academic research and transfer limits

Metered electricity per tonne uses the energy-meter difference divided by weighed feed tonnes over the same interval. Motor kW or HP is a rating, not an energy reading. Keep thermal energy separate unless an explicit conversion and boundary are agreed. These are editorial comparison rules; no actual result or guarantee is entered here.

Project stages and existing downloads

↑ Project stages and downloads

Rapeseed / canola research evidence for selection questions

PUBLIC RESEARCH · APPARATUS AND FEED BASIS · LIMITS TO TRANSFER

Rapeseed / canola research evidence for selection questions

Source-bounded public research examples for asking better selection and trial questions. These are published study results or abstract statements, not our tests, supplier quotations, production guarantees or customer-signed acceptance records.

Published experimental apparatus, feed matrix, reporting basis and evidence depth are shown separately. Do not transfer a result to the representative RFQ model without configuration-matched feed trials and agreed criteria. No existing supplier capability grade or acceptance status is changed.

Farmer 20-duo rapeseed pressing study

Mizera, Herák, Hrabě and Kabutey. Agronomy Research 16(S1):1118–1123,2018; DOI 10.15159/AR.18.059. Published: 2018. Reviewed: 2026-11-03.

Evidence depth: Full experimental paper

Material and apparatus: Rapeseed on a Farmet Farmer 20-duo, with tested speeds 10–65 rpm. The paper defines recovery against Soxhlet-determined oil in seed; this is not a CP2 production-package test.

Reported observationValue and reporting basis
Highest reported recovery

Published experimental result

82.6% at the lowest tested speed

Peak recovery; not the same operating point as the conclusion’s energy/throughput compromise.

Locator: Abstract; Conclusion,p. 1122

Conclusion’s compromise point

Reported conclusion/model-derived point

20 kg seed/h; 76.3% recovery; 0.61 kWh/kg oil

The energy value is model-derived using Eq. 2 and is per kilogram of oil, not per kilogram of seed or total plant consumption.

Locator: Conclusion,p. 1122

Do not transfer beyond this scope: Discussion,p. 1121 also cites 25 kg/h and about 0.5 kWh/kg oil; do not merge these with the conclusion into one universal optimum. Actual nozzle/feed conditions and a CP2 scale-up basis remain to confirm.

Source, access depth and review boundary

University repository record and complete 6-page paper retrieved directly HTTP200; conclusion visually checked.

Primary publisher / institutional record · Study DOI

Read the original full paper at its publisher / university repository

Public study evidence does not replace a configuration-matched trial or a signed customer FAT/SAT record.

Use the evidence in your existing enquiry and comparison

The following are editorial requests. Ask for the actual offered configuration and representative-feed records; do not copy the study’s numbers into guarantee or acceptance cells.

Read the existing representative supplier’s scope and evidence limits · Plan representative-feed trials · Project stages and existing downloads

↑ Project stages and downloads

Rapeseed / canola project documents

PROJECT DOCUMENTS · USE WHAT YOU NEED NOW

Rapeseed / canola project documents

Start with the material and process route, then use the five document stages below. Include trial criteria in the enquiry and revisit earlier steps whenever feed, configuration or scope changes.

Before the enquiry: Review this processing route · Read the evidence categories · Public research examples and limits · Production records and open requests · Blank record forms · Fictional filling examples and review.

These are editorial planning documents and blank templates. Supplier listings and official-source descriptions do not establish a quotation, agreed responsibility, test result or accepted plant.

All Rapeseed / canola downloads · 15 files (13 preserved + 2 fictional examples)

Shared guides

Blank production-record forms

Fictional filling examples (not real evidence)

Rapeseed / canola: evidence and process gaps

SOURCE · TEST SUPPORT · PROJECT · ACCEPTANCE

Rapeseed / canola: evidence and process gaps

Evidence categories describe what is documented, not supplier ability, quality, ranking, certification or approval for a crop.

Editorial organization of 49 extended dossiers, one retained access exception and 106 product-scope directory additions; no supplier certification.

48
extended dossiers linked here

141
original profiles retained

0
complete signed reports obtained

Source material

  • Company website material: 135
  • Supplier-posted platform material: 3
  • Legacy catalogue / revision unconfirmed: 2
  • Access unresolved / no extended review: 1

Test-support evidence

  • Published test-support description: 19
  • Pilot equipment / R&D offering; service to confirm: 3
  • Reported run / internal checks; scope limited: 7
  • Actual-feed trial scope unconfirmed: 111
  • No extended trial review: 1

Project material

  • Named supplier project account: 12
  • Site, country, order or caption account: 11
  • Facility, service or application reference: 7
  • No attributable project established: 110
  • No extended project review: 1

A test-service, pilot-equipment or internal-test description is not your actual-feed result. Confirm equipment, samples, measurements and reporting. A named supplier account is not signed acceptance, independent verification or automatic relevance to your crop; historical, construction and other-material limits remain in each dossier.

No complete readable signed customer FAT/SAT dataset was obtained in this reviewed collection. This does not mean the supplier has no such records.

CPM and Crown share group resources; ABC and BEST share branding references. Do not count related brands as independent factories or trial sites.

Rajkumar remains an access exception, outside the49 extended dossiers. Its original profile is preserved; search caches do not establish current supply.

Resolve three gates before treating a reference as your project

  1. Current quotation: confirm the contracting party, manufacturer, model/revision, crop duty, included equipment and utilities.
  2. Representative trial: agree samples, equipment, settings, calibrated measurements, analyses, raw records and scale-up limits. A service description alone does not pass this gate.
  3. Agreed acceptance: obtain project-specific FAT/SAT criteria, measurements, deviations closed and authorized signed release. Supplier photos, shipment news or ceremonies alone do not pass this gate.

Process scope and the next document to request

Counts below are profiles with a reviewed product-stage reference and a route link. They are not confirmed crop-specific installations, independent factory counts or an exhaustive market survey. Read each profile's scope before shortlisting.

StageProfile referencesResolve before choosing
Seed preparation57Agree seed condition, cleaning/dehulling scope and a prepared-feed balance; record moisture and actual conditioning settings.
Mechanical pressing49Agree exact model/revision, feed input and operating hours; measure oil/cake balance, temperature and residual-oil analytical basis.
Solvent extraction & meal treatment28Agree preparation, extractor, meal treatment and solvent-recovery boundaries, utilities, specialist design and actual-feed measurements.
Oil clarification & filtration27Agree oil viscosity/temperature, solids loading, filter media, pressure/flow limits, cleaning and measured filtrate quality.
Oil refining & finishing41Agree crude-oil analyses, selected refining/dewaxing steps, utility boundaries, sampling and product/cold-test methods.
Finished-oil packaging25Test the actual finished oil, bottle and closure; agree fill-mass/volume calibration, speed, closure checks and cleaning.
Residue & wastewater treatment2Characterize the actual sludge/residue; agree separation targets, recovered-material handling and treatment test records.

Questions for this oilseed

  • Identify rapeseed / canola feed and the intended oil and cake / meal products.
  • Compare full pressing against pre-pressing plus cake extraction with the same feed and operating hours.
  • Agree conditioning, oil treatment and any downstream extraction / meal-treatment boundary.
Read the evidence categories for 141 original profiles
ProfileSourceTrial supportProject materialScope / acceptance limit
ABC Machinery (KMEC)Company website materialReported run / internal checks; scope limited
Togo soybean/peanut line: reported commissioning test run
Named supplier project account
Moldova sunflower pressing/refining project account
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Accutek PackagingCompany website materialPublished test-support description
Accutek nozzle laboratory selection and published FAT offer
No attributable project established
Installation/training services: customer-project evidence gap
Finished-oil packaging only
No complete readable signed customer report obtained
AGI - Ag Growth InternationalCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
AgrowindoCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Alfa LavalCompany website materialPublished test-support description
Separator testing and Explorer pilot options
Named supplier project account
AAK Karlshamn PX 95 LevelUP retrofit
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Alliance Industria MecanicaCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Allocco - MAPCACompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
AmafilterCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Anderson InternationalCompany website materialPublished test-support description
Stow Mini Expeller feasibility studies
Named supplier project account
MIDIKA toll/pilot crushing project
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Andreotti ImpiantiCompany website materialActual-feed trial scope unconfirmed
Tailored special plants: public configuration-trial evidence gap
Named supplier project account
Carrinho Angola commissioning report and separate soybean project award
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
ANDRITZ SeparationCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Antti-TeollisuusCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
BeccariaCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
BEST Oil Press MachineryCompany website materialActual-feed trial scope unconfirmed
Factory visits, project evaluation and installation/debugging
Site, country, order or caption account
Russia rapeseed / Uzbekistan sunflower installation accounts
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
BINCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Borghi Industrial EquipmentsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Brissun TechnologiesCompany website materialPilot equipment / R&D offering; service to confirm
Brissun pilot plants and R&D testing facilities
No attributable project established
Turnkey project overview: named acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
BRONTOCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Bühler GroupCompany website materialPublished test-support description
Grain Innovation Center: preparation trials
Facility, service or application reference
Grain Innovation Center opening, October 2024
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Can-Seed EquipmentCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
CanapugliaCompany website materialActual-feed trial scope unconfirmed
Hemp processing, analysis and courses: core-crop trial scope unconfirmed
No attributable project established
Booking / processing-service pages: comparable acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Captains GroupCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
CDACompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Changing NepalCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
CimbriaCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
CPM (incl. CPM Crown)Company website materialPublished test-support description
Waterloo testing lab and shared CPM | Crown Innovation Center
Facility, service or application reference
CPM | Crown GIC facility description, February 2026
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Croll ReynoldsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Crown Iron WorksCompany website materialPublished test-support description
CPM Crown GIC and Liquids Pilot Plant
Facility, service or application reference
Crown Global Innovation Center facility reference
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
DesmetCompany website materialPublished test-support description
Desmet pilot hall and Kuala Lumpur refining R&D
Site, country, order or caption account
Germany Reflex shipment and installation-stage reference
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
DESMICompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Dinnissen Process TechnologyCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
DVC Process TechnologiesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
E-One MachineryCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
E-PAK MachineryCompany website materialActual-feed trial scope unconfirmed
E-PAK product/container sample guidance: trial evidence gap
No attributable project established
Custom-engineering guidance: no named accepted oil project established
Finished-oil packaging only
No complete readable signed customer report obtained
EMS-Pellet - EMS OilCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
FabrimaqCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
FarmetCompany website materialPublished test-support description
Farmet laboratory and pilot centre
Named supplier project account
Hungary rapeseed CP2 commissioning reference
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
FAUDICompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
FERMETECHCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Filmatic Packaging SystemsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
FILTROXCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Florapower GmbHCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
FlottwegCompany website materialPublished test-support description
Process Center feasibility and scale-up work
Facility, service or application reference
Seed/press-oil application reference; customer acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
French Oil Mill MachineryCompany website materialPublished test-support description
Innovation Center customer-material trials
Named supplier project account
Can Pro Ingredients canola development and startup
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Gagan InternationalCompany website materialActual-feed trial scope unconfirmed
Engineering, installation and commissioning support: seed-trial scope unconfirmed
No attributable project established
Commissioning / handover claims: named acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
GEA GroupCompany website materialPublished test-support description
Process Test Center and Remote FAT services
Facility, service or application reference
Oelde Process Test Center expansion plan, September 2026
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Gianazza InternationalCompany website materialActual-feed trial scope unconfirmed
Commissioning / training services: sample-trial scope unconfirmed
Site, country, order or caption account
Colombia PHYSITRON CSF caption: historical acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Gobind ExpellerCompany website materialActual-feed trial scope unconfirmed
Inspection and after-sales descriptions: seed-trial scope unconfirmed
No attributable project established
Quality labels / global presence: customer acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Gopal Expeller CompanySupplier-posted platform materialActual-feed trial scope unconfirmed
Quality-assurance tests: actual-seed trial scope unconfirmed
No attributable project established
Hosted ratings / reviews: project-acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Graham ManufacturingCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Harburg-FreudenbergerCompany website materialActual-feed trial scope unconfirmed
HF equipment testing and inspection; pilot-trial scope unconfirmed
Facility, service or application reference
EP16 to EP20 conversion-kit offering, not a customer acceptance case
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
HAUS Centrifuge TechnologiesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
HellasPackCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
HEMACompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Henan DoingCompany website materialActual-feed trial scope unconfirmed
Installation, machine testing and worker-training service
Site, country, order or caption account
Nigeria peanut and Azerbaijan sunflower orders — 2026
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Henan HuataiCompany website materialReported run / internal checks; scope limited
DR Congo palm-fruit project: reported trial run, July 2023
Site, country, order or caption account
Ethiopia multi-seed processing: June 2021 operation report
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
HISAKA WORKSCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
HUM Oil & Fat TechnologiesCompany website materialActual-feed trial scope unconfirmed
HUM engineering services: configuration-trial evidence gap
No attributable project established
Kazakhstan engineering/manufacturing and European rapeseed-cake handover
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Industrias SaviniCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Japan Machinery StoreCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Jas EnterpriseCompany website materialReported run / internal checks; scope limited
Manufacturing checks and development trials: customer-trial scope unconfirmed
No attributable project established
Company capability statements: named acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
JET-VAC TechnologiesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
JJ-Lurgi EngineeringCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
JK MachineryCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
KERNKRAFT / oil press GmbH & Co. KGCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Koerting HannoverCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Kongskilde IndustriesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
KULP Packaging MachineryCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Kumar Metal IndustriesCompany website materialPublished test-support description
OM Innovation Centre: instrumented pilot trials
Named supplier project account
GSFIL Ghana shea-nut case, published October 2021
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
LIM ServotecnitalCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
LIPICO TechnologiesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
MecmarCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Mectech Process EngineersCompany website materialPilot equipment / R&D offering; service to confirm
Mectech pilot-plant supply for refining and oil/fat development
No attributable project established
Published avocado/hazelnut refinery installation claims
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
MepuCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Metro EquipmentCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
MEYER EuropeCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
MMEC - Maqbool Mughal Engineering CompanyCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Muar Ban Lee (MBL)Company website materialReported run / internal checks; scope limited
EK-300-K internal testing since 2013: palm-kernel scope
No attributable project established
Palm-kernel plant gallery: material and acceptance gap
Conditional oil-filtration reference only
No complete readable signed customer report obtained
Muez-HestCompany website materialPublished test-support description
Muez-Hest R&D Centre: laboratory and pilot-scale validation
Named supplier project account
B. N. Agritech sunflower dewaxing; August 2024 refinery listing
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
MULMIXCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Myande GroupCompany website materialPublished test-support description
Myande Innovation and Technology Center
Named supplier project account
Dianxue refinery acceptance ceremony report
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
N&T EngitechCompany website materialActual-feed trial scope unconfirmed
Commissioning and technical support: seed-trial scope unconfirmed
No attributable project established
Tanzania project listing: detailed acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
NeostarpackCompany website materialPublished test-support description
Neostarpack sample testing, remote FAT and site SAT workflow
Site, country, order or caption account
Japanese soy-sauce packaging case: cross-product reference
Finished-oil packaging only
No complete readable signed customer report obtained
Nita Labeling SystemsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
OCMECompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Oil-Press-Machine.comCompany website materialActual-feed trial scope unconfirmed
Selection / design / installation advice: sample-trial scope unconfirmed
No attributable project established
Solution examples / Huatai project captions: provenance and acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Oilseed Technologies MagdeburgCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
OiltekCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
OlexaCompany website materialPublished test-support description
Olexa testing station and feed-specific configuration
No attributable project established
Review 2025: sunflower expansion and rapeseed/sunflower construction
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
OLISCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Oliver ManufacturingCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
PackservCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
PACK’RCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
PETKUS TechnologieCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Porvair Filtration GroupCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
POSIMATCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Prado SilosCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
ProFruit MachineryCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Rajkumar Agro EngineersAccess unresolved / no extended reviewNo extended trial review
Official source access unresolved
No extended project review
No extended review
Read the profile for the crop and process boundary
Not established; source access unresolved
ReinartzCompany website materialPublished test-support description
Operational press testing through rental
Named supplier project account
Pirahy Alimentos rice-bran reference and research
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
RIELACompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Ropak ManufacturingCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Russell FinexCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Saro Agro IndustrialCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
SATIVA ADVICES SERVICES - PROENERGYCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Seed Oil PressCompany website materialActual-feed trial scope unconfirmed
Installation / debugging / training: feed-trial scope unconfirmed
Site, country, order or caption account
Malawi 2011 export and country-labelled cases: historical acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
SeracCompany website materialPublished test-support description
Jean-Jacques-Graffin Innovation Center: packaging tests
Named supplier project account
Lesieur edible-oil installation; Food Union dairy FAT/SAT account
Finished-oil packaging only
No complete readable signed customer report obtained
Shandong Chemsta MachineryCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Sharma Expeller CompanyCompany website materialActual-feed trial scope unconfirmed
Running-video sections and after-sales support: trial scope unconfirmed
No attributable project established
Company counters / running videos: named acceptance evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Sharplex FiltersCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Shibuya CorporationCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Shreeji Expeller IndustriesSupplier-posted platform materialActual-feed trial scope unconfirmed
Testing Equipment label: sample-trial scope unconfirmed
No attributable project established
Hosted testimonials: acceptance and project gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Sinoder IndutechSupplier-posted platform materialActual-feed trial scope unconfirmed
Installation / equipment testing: actual-feed trial unconfirmed
No attributable project established
Group project totals / trading-company profile: attribution gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
SolubagCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Spectec Techno ProjectsLegacy catalogue / revision unconfirmedPilot equipment / R&D offering; service to confirm
Pilot Projects offering: trial-service scope unconfirmed
Named supplier project account
Vaibhav / SVMA legacy references: date and acceptance gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
STELA LaxhuberCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
SymagaCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Talleres BelgranoCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TANIS Seed Pro TechCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TECHNIBAGCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TECHNOILOGYCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TencoCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TETRACO Engineering and ConsultantsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TinytechCompany website materialReported run / internal checks; scope limited
Installation/training support and historical test-run feedback
Site, country, order or caption account
Uttar Pradesh mustard installation report — June 25, 2025
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
TNL TecnalCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TOMRA FoodCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TornumCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TroikaCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Tsukishima KikaiCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
TäbyPressenLegacy catalogue / revision unconfirmedActual-feed trial scope unconfirmed
Assembly / cleaning / feed instructions: customer-trial scope unconfirmed
Site, country, order or caption account
Finland running-hours / customer-video references: historical evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
Veendeep Oiltek ExportsCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Veter Packaging MachinesCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Viking PumpCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
VKPAKCompany website materialActual-feed trial scope unconfirmed
Training and installation/debugging: sample-trial scope unconfirmed
No attributable project established
Edible-oil line label / country-tagged customer photos: acceptance gap
Finished-oil packaging only
No complete readable signed customer report obtained
VOLPAKCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
WeightpackCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
WestrupCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
YKL GroupCompany website materialReported run / internal checks; scope limited
YTH-18 design testing / R&D: residue-trial gap
Site, country, order or caption account
Indonesia 1200 MT/day KCP: supplier project account
Conditional residue treatment only
No complete readable signed customer report obtained
ZaninCompany website materialActual-feed trial scope unconfirmed
Not investigated as part of this supplier-discovery addition
No attributable project established
No separate project verification in this addition
Published product/process scope; read crop limits
Directory listing; project performance not independently verified
Zhengzhou DingshengCompany website materialReported run / internal checks; scope limited
R&D workshop and laboratory: customer-trial access unconfirmed
Site, country, order or caption account
Russia rapeseed-cake extraction: historical installation progress
Read the profile for the crop and process boundary
No complete readable signed customer report obtained
ÖlwerkCompany website materialPublished test-support description
Ölwerk Standard / Plus / Premium test-press service
Facility, service or application reference
Rental offer and test deliverables: customer-project evidence gap
Read the profile for the crop and process boundary
No complete readable signed customer report obtained

Filter and compare documented references. Evidence categories are included in the comparison and downloadable brief; no enquiry is sent.

↑ Project stages and downloads

Check the model, trial plan and project evidence

Check the model, trial plan and project evidence

Forty-nine extended reviews link official or supplier-branded catalogue configurations, trial support and dated project/application material. Supplier news about installation, shipment, construction or test facilities is kept distinct from signed customer acceptance reports. Cross-material and cross-industry examples retain their stated scope. Complete readable signed acceptance reports and test datasets have not been obtained from the selected sources. Use each profile's existing crop/stage scope; these references do not approve a complete line. Rajkumar is not included in these 49 addenda: its official domain returned a domain-connection error at this review, while a historical domain redirected to an unrelated host. Its original profile is preserved; search-cache listings do not confirm current supply.

  • Farmet — Compact EP1 with FE 500 and FS 350, CP2 two-stage cold-pressing technology. Read trial support and the project/acceptance evidence limits.
  • French Oil Mill Machinery — Achiever 11 / 22 / 33 / 44 / 55 / 66, L-250 laboratory screw press. Read trial support and the project/acceptance evidence limits.
  • Anderson International — Lion 600 / 1200 / 1600. Read trial support and the project/acceptance evidence limits.
  • Flottweg — FW400 decanter, Z-Series decanter family. Read trial support and the project/acceptance evidence limits.
  • Myande Group — MPSG 35*180 / 40*210 oilseed crackers, E-type extractor. Read trial support and the recorded project/acceptance status.
  • Desmet — Reflex extractor, LM / LLL extractor families. Read trial support and the recorded project/acceptance status.
  • Alfa Laval — PX 115 vegetable-oil separator, PX 115e vegetable-oil separator. Read trial support and the recorded project/acceptance status.
  • Crown Iron Works — Model III continuous-loop extractor, Desolventizer-Toaster / Dryer-Cooler configuration. Read trial support and the recorded project/acceptance status.
  • Bühler Group — DOQB flaking mill, OLCC cracking mill. Read trial support and the recorded project/acceptance status.
  • GEA Group — RSE oil-refining separator series, RSI oil-refining separator series. Read trial support and the recorded project/acceptance status.
  • Reinartz — AP 08–AP 15 rental range, AP 25 cold-press catalogue reference. Read trial support and the recorded project/acceptance status.
  • Kumar Metal Industries — X’Press: XP-100 / XP-200 / XP-250 catalogue configurations, Super Press: NSP IIA / IIB / IIC / IIIC / IIICLD. Read trial support and the recorded project/acceptance status.
  • Olexa — Oléane 50 / Oléane 100 cold-press range, MBU 730: pre-press / cold-press / single hot-press duties. Read trial support and the recorded project/acceptance status.
  • Serac — COMBOX edible-oil blow-fill-cap configuration, RB rotary electronic weigh filler-capper. Read trial support and the recorded project/acceptance status.
  • CPM (incl. CPM Crown) — Roskamp 1200: SPX / DPX 1200-24 through 1200-72, SP flaking mill: 2800-52 / 2800-62 / 3200-72 / 3200-78 / 3200-84, Crown VSC vertical seed conditioner. Read trial support and the recorded project/acceptance status.
  • Mectech Process Engineers — Soybean refinery: degumming / neutralization / bleaching / deodorization configuration, Vertical pressure-leaf filter: PLC / cake-discharge configuration. Read trial support and the recorded project/acceptance status.
  • HUM Oil & Fat Technologies — NYP full press: 15F / 30F / 45F / 60F / 75F, NYP pre-press: 05 / 15 / 30 / 45 / 60 / 75 / 90. Read trial support and the recorded project/acceptance status.
  • Harburg-Freudenberger — SP pre-press: SP220P / SP280P / SP340P / SP340XP, SP final press: SP160 / SP220F / SP280F / SP340F. Read trial support and the recorded project/acceptance status.
  • Muez-Hest — Alkali refining / washing / drying configuration, Dewaxing crystallization / separation configuration. Read trial support and the recorded project/acceptance status.
  • Andreotti Impianti — B-Type belt / R-Type rotary extraction configurations, Refining: degumming / neutralization / bleaching / winterizing / deodorizing. Read trial support and the recorded project/acceptance status.
  • Ölwerk — OW 100 s-inox - OW-100-SINOX, OW 500 s-inox - OW-500-SINOX. Read trial support and the recorded project/acceptance status.
  • Henan Huatai — Oilseeds flaking mill: roller / feed-preparation configuration, Rotocel / loop / drag-chain / tank extraction options. Read trial support and the recorded project/acceptance status.
  • Neostarpack — FG1000 tabletop gear-pump filler, FG4250 automatic gear-pump filler, FG5470-CS4150-LD4000 integrated packaging line. Read trial support and the recorded project/acceptance status.
  • Accutek Packaging — SVF1-2 / SVF Series piston-volumetric fillers, Auto Mini Pinch timed-flow filler. Read trial support and the recorded project/acceptance status.
  • E-PAK Machinery — Time-based metering pump / Tri-Filler configuration, Gravity / pressure-gravity filler configuration. Read trial support and the recorded project/acceptance status.
  • ABC Machinery (KMEC) — YZS-68 / 80 / 95 / 100 / 120 / 130 / 165 screw presses, Batch / rotary / loop / crawler extraction configurations. Read trial support and the recorded project/acceptance status.
  • Brissun Technologies — Sunflower physical-refining / continuous winterization configuration, Skid-mounted modular refining-plant configuration. Read trial support and the recorded project/acceptance status.
  • Tinytech — 22-inch x 4-inch expeller / Round Electric and steam cooking-kettle configurations, Mini Oil Mill Plant configuration, 12-inch to 30-inch plate filter-press configurations. Read trial support and the recorded project/acceptance status.
  • N&T Engitech — FITTER B-10 / B-25 Bronze oil expellers, FITTER S-50 / S-75 / S-100 Silver oil expellers, Oilseed crushing / solvent-extraction / refining plant configuration. Read trial support and the recorded project/acceptance status.
  • Henan Doing — 6YL-80 / 6YL-100 / 6YL-120 / 6YL-130 / 6YL-160 and YZYX90-2WZ press references, Rotocel solvent-extractor configuration, Batch / continuous edible-oil refinery configuration. Read trial support and the recorded project/acceptance status.
  • Zhengzhou Dingsheng — ZX18A(200-3) oil press with preheating cooker, 30-100T Rotocel / chain-type extraction configuration, 1-10T batch crude-oil refining configuration. Read trial support and the recorded project/acceptance status.
  • BEST Oil Press Machinery — YZS-95 single-screw oil press, YZS-95A / YZS-95B / YZS-95C automatic press configurations, 1-5TPD mini crude-oil refinery configuration. Read trial support and the recorded project/acceptance status.
  • Gobind Expeller — ANAND STELLAR-I / STELLAR-II / STELLAR-III expellers, ANAND BOLT double- / triple-chamber press configuration, 12-inch to 36-inch plate / plate-and-frame filter presses. Read trial support and the recorded project/acceptance status.
  • Sharma Expeller Company — SOM-2 / SOM-5 / SOM-7.5 / SOM-8 / SOM-10 / SOM-15 / SOM-25 / SOM-30 press listings, 12-bolt / 9-bolt / 6-bolt / 4-bolt expeller configurations, 14X14 / 16X16 / 18X18 / 20X20 / 22X22 / 24X24 filter-press configurations. Read trial support and the recorded project/acceptance status.
  • Gagan International — Single- / double-chamber expeller and seed-preparation configuration, Batch / continuous solvent-extraction configuration, Physical / chemical edible-oil refinery configuration. Read trial support and the recorded project/acceptance status.
  • Jas Enterprise — JAS-OMM-400 domestic screw press, JAS-OMM-1400 mini commercial screw press, JAS-OMM-2350 commercial oil maker. Read trial support and the recorded project/acceptance status.
  • Canapuglia — Little Oil Press / Mini pressa per olio configuration, Oil Press / Pressa per olio with feed and extraction control, Hemp-seed cold squeezer — max 28-degree listing. Read trial support and the recorded project/acceptance status.
  • VKPAK — VK-PF servo-piston filling configuration, VK-WF net-weight filling configuration, VK-SC spindle screw-capping configuration. Read trial support and the recorded project/acceptance status.
  • TäbyPressen — Type 55 / Type 55-2 conversion reference, Type 70 / Type 90 and 70-2 / 90-2 conversion references, F70 / F70S settled-oil filtration reference. Read trial support and the recorded project/acceptance status.
  • Seed Oil Press — 6YL-68 / 6YL-80 / 6YL-95 / 6YL-120 / 6YL-120C / 6YL-130 / 6YL-160 screw-press catalogue, 6YL-80 A / 6YL-95 A / 6YL-120 A / 6YL-120C A / 6YL-130 A / 6YL-160A integrated press, Canola 1-20 TPD mechanical-line configuration. Read trial support and the recorded project/acceptance status.
  • Oil-Press-Machine.com — 6YL-68 / 6YL-80 / 6YL-95 / 6YL-95-1 / 6YL-100 / 6YL-120 / 6YL-120C / 6YL-130 / 6YL-150 / 6YL-160 table, Pre-press / subsequent extraction configuration, Refining equipment family / Huatai attribution boundary. Read trial support and the recorded project/acceptance status.
  • Gopal Expeller Company — Gopal Heavy Duty 35 TPD Soybean Oil Expeller, Gopal 10TPD sunflower / 20 TPD multi-seed configurations, Gopal 10000 LPH oil-filter press / quotation-specific configuration. Read trial support and the recorded project/acceptance status.
  • Muar Ban Lee (MBL) — NYB Series vertical leaf filter / conditional oil compatibility, MBL-80-FP filter-press configuration, MBL-80-FPHY hydraulic filter-press configuration. Read trial support and the recorded project/acceptance status.
  • Shreeji Expeller Industries — VK-150 / VK-100 expeller configurations, VIRAAT-160 / cooking-oil press catalogue distinctions, VK-200 in the Testing Equipment catalogue. Read trial support and the recorded project/acceptance status.
  • YKL Group — YTH-9.35 / YTH-9.18 / YTH18 / YTH9.15S: palm-kernel scope, SRORS / Aqua Eco and three-phase decanter configuration, KSP-403 / YH-1500L desludging and dewatering. Read trial support and the recorded project/acceptance status.
  • Sinoder Indutech — ZY24A / ZX24A / ZY28 / ZX28 / ZY32 / ZX32 and 6YL range, Soybean / sunflower solvent-extraction line configuration, HL-10 refinery listing / quoted process configuration. Read trial support and the recorded project/acceptance status.
  • Gianazza International — DOVERT CS / DOVERT CSV / DOVERT TR catalogue family, PHYSITRON CS / PHYSITRON CSF / PHYSITRON TR family, Dewaxing by filtration / polishing configuration. Read trial support and the recorded project/acceptance status.
  • Spectec Techno Projects — Legacy batch-refinery process configuration, Legacy continuous-refinery / leaf-filter configuration, Legacy continuous solvent-extraction configuration. Read trial support and the recorded project/acceptance status.