OilProcessingHub — Rapeseed / canola equipment scope and test-data RFQ draft Reviewed: 2026-11-03 STATUS: BUYER-EDITABLE REQUEST — NOT A QUOTE, TEST RESULT OR ACCEPTANCE Buyer-editable equipment-scope and test-data requests. Representative catalogue examples are starting points for an enquiry, not a supplier ranking, final size selection, quotation, order or accepted performance. Published facts are limited to the linked official catalogue/service descriptions. All scope lines, tests, commercial terms and acceptance requests below are editorial questions for written agreement; current supply, crop fit, trial access and results remain unconfirmed. No enquiry is sent. BUYER PROJECT INPUT — COMPLETE BEFORE SENDING Project / site / country and intended commissioning date: ____________________ Actual oilseed variety/lot, raw or prepared feed, moisture and analytical oil basis: ____________________ Required daily input, operating hours, turndown and feed variability: ____________________ Oil and cake/meal destinations, specifications and required analyses: ____________________ Available space, utilities, electrical supply and local requirements: ____________________ Requested process boundary, optional stages, buyer-supplied equipment and interfaces: ____________________ Representative sample quantity/shipping terms to agree with test provider: ____________________ Buyer technical/commercial contact and response deadline: ____________________ REPRESENTATIVE ENQUIRY EXAMPLE Farmet CP2 — two-stage cold-pressing enquiry example Farmet presents CP2 as first-stage and final pressing with oil separation/filtration and FIC controls, and identifies rapeseed/canola among its applications. CP2 is a configured technology; it does not identify a universal fixed press model. Request press model, count and revision for both stages, not only the CP2 name. Do not import the FS4015 machines from a historical project or the FE 500 / FS 350 pairing from EP1. Confirm your crop lot and chosen cold-press definition. Proposed equipment / alternative offered by supplier: ____________________ PROCESS BOUNDARY TO CONFIRM Initial enquiry: actual rapeseed/canola feed through two mechanical press stages to clarified oil and cake. Temperature stabilization, cleaning, optional dehulling, oil treatment and storage are separate scope decisions. No solvent line is implied. EQUIPMENT SCOPE — REQUEST AN ITEMIZED RESPONSE E01 — Reception, cleaning and temperature stabilization Itemize feed bin, cleaning, weighing and optional stabilization/dehulling. Define actual incoming seed range and the supplier-approved response to low-temperature feed. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ E02 — First-stage press bank Specify each press model/count, feeder, screw/cage configuration, drive/control and first-stage cake/oil measurement points. State redundancy and turndown assumptions. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ E03 — Interstage transfer and final press bank Specify cake conveying, final press model/count and settings, interstage sampling and bypass/recycle rules. Define how the two stages form the offered operating envelope. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ E04 — Oil separation and filtration Itemize settling/separation, pumps, filter type/consumables and solids handling; distinguish each stage oil stream from blended clarified oil and any treatment/storage option. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ E05 — Cake and product treatment interfaces Define final cake cooling/conveying/packing and any refining/pigment-treatment option on actual crude oil; request separate scopes for additional product claims. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ E06 — FIC and site services Request FIC hardware/software and data-export scope, utility and foundation loads, local electrical interfaces, wear parts, installation/training and factory/site test allocation. Offered model / count / revision / included or option or excluded / interface owner / price reference: ____________________ TEST DATA — REQUEST EDITABLE RAW RECORDS AND TRACEABLE REPORTS R01 — Offered equipment and trial-machine mapping Requested fields: Revision-controlled equipment schedule; model/count/serial or trial ID; screw/cage/die, drive/control and option list; differences between trial and production build. Reporting basis: Supply drawings/BOM and a written scale-up/uncertainty note; identify every untested assumption. Acceptance deliverables: D01 / D03 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R02 — Feed, sampling and laboratory baseline Requested fields: Lot/cultivar/storage, preparation, moisture/volatile matter and analytical extractable oil; sample register, retained splits, method edition and lab identity. Reporting basis: State raw/prepared feed, units and wet/dry basis. Analytical extractable oil is not production oil recovery. Acceptance deliverables: D02 / D05 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R03 — Measured-run raw data Requested fields: Timestamped feed, run/stabilization periods, downtime, temperatures, load and utilities, calibration references and planned repeats. Reporting basis: Request editable CSV/XLSX plus run/configuration IDs; separate startup and steady operation, and define kg/h and kWh/t denominators. Acceptance deliverables: D03 / D05 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R04 — Matched products and balance workbook Requested fields: Feed, oil, cake and any hull/fines/reject/water streams; inventory changes and recycle; matched oil/cake samples and residual-oil results. Reporting basis: Request editable mass/oil calculations and laboratory reports with method/basis/uncertainty; distinguish filtered oil, crude oil and analytical oil. Acceptance deliverables: D02 / D05 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R05 — Performance offer and factory/site decision matrix Requested fields: For each proposed guarantee: value/unit, feed envelope, run duration, method, basis, decision rule, witness/authority, deviations/retest and FAT versus site-only SAT allocation. Reporting basis: Ask supplier to separate indicative estimates from contractual offers; limits, actual results and signatures stay blank until agreement/testing. Acceptance deliverables: D01 / D04 / D06 / D07 / D08 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R06 — Two-stage operating and mass balance Requested fields: First-stage and final-stage feed/output samples, oil/cake masses, configurations, actual settings and recycle/hold-up observations. Reporting basis: Report stage and overall balances on one declared feed/moisture basis; do not sum recycled material as fresh input. Acceptance deliverables: D03 / D05 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R07 — Cold-press temperature evidence Requested fields: Incoming seed, stabilization if used, stage oil/cake temperatures and ambient/utility conditions over the measured period. Reporting basis: Agree measurement points and product definition before testing; the technology name is not an accepted temperature guarantee. Acceptance deliverables: D01 / D03 / D05 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ R08 — Oil and meal/cake market analyses Requested fields: Actual cultivar/lot, chlorophyll/fatty-acid and cake analyses where requested, method/edition, matrix, units, sample IDs and laboratory results. Reporting basis: Do not replace rapeseed/canola data with mustard data or one historical project. Additional treatment requires a separate actual-oil test. Acceptance deliverables: D02 / D05 / D07 Supplier response / document ID / revision / raw-data link / gap / due date: ____________________ COMMERCIAL AND SERVICE RESPONSE Itemized base equipment, optional packages and buyer-supplied exclusions: ____________________ Trial fee, required sample quantity, booking, shipping/return and report access terms: ____________________ Equipment price/currency, quote validity, named delivery place and proposed Incoterms edition/rule: ____________________ Production/delivery schedule and installation/commissioning responsibilities: ____________________ Payment milestones, warranty, service and consumable/wear-part scope: ____________________ Utility requirements, drawings/document language, controls/data-export and training: ____________________ Proposed performance terms and FAT/SAT protocol; deferred checks and retest responsibilities: ____________________ Customer-authorized comparable reference and available signed records, with permission and confidentiality limits: ____________________ FOR EVERY PROPOSED PERFORMANCE CRITERION Offered model / quantity / revision: ____________________ Included / optional / excluded / buyer-supplied, plus interface owner: ____________________ Value / unit / feed and moisture basis / method and edition: ____________________ Document ID / date / raw-data link / laboratory / calibration: ____________________ Indicative or contractual / limits to agree / deviations / open questions: ____________________ Agreed limit / decision rule / actual result / authorized signature: ____________________ RELATED TRIAL PLAN AND D01–D08 DELIVERY REGISTER https://oilprocessinghub.com/oilseeds/rapeseed/#trial-acceptance-protocol https://oilprocessinghub.com/assets/briefs/rapeseed-trial-acceptance.txt OFFICIAL CATALOGUE / SERVICE BASIS Farmet CP2 two-level cold pressing https://www.farmet.cz/en-us/cp2-two-level-cold-pressing Farmet OFT research and pilot centre https://www.farmet.cz/en/farmet-oft-presentation Existing supplier profile: https://oilprocessinghub.com/suppliers/farmet/#configuration-evidence Related RFQ scope: https://oilprocessinghub.com/oilseeds/rapeseed/#equipment-rfq No enquiry is sent. Review and complete the buyer fields before contacting a supplier. All values, guarantees, trial booking, scope inclusion and release decisions require written agreement. No completed trial or signed FAT/SAT record is supplied by this blank request.